26 Ноября 2024 | вторник | 22:42
|
НовостиRussian fast reactor reaches full powerАвгуста 19, 2016Unit 4 of the Beloyarsk nuclear power plant started operating at 100% power for the first time. The BN-800 fast neutron reactor is scheduled to enter commercial operation later this year. Gas transmission via Nord Stream has been resumed as plannedАвгуста 18, 2016Nord Stream AG successfully conducted annual maintenance work on its twin gas pipeline system between August 9 and 17, 2016 with a temporary shutdown of both lines. Enel invested $180 million in the construction of the new solar plant in ChileАвгуста 17, 2016Enel, through its subsidiary Enel Green Power Chile Ltda. ("EGPC"), has completed and connected to the grid its PV solar park Carrera Pinto, located 60 kilometres from the city of Copiapó in the Atacama Region of Chile. TKZ equipment for Yakutskaya SDPP-2 under construction has successfully passed hydraulic testsАвгуста 16, 2016Hydraulic tests have been completed at Yakutskaya SDPP-2 under construction (first stage) of four hot-water heat-recovery boilers manufactured by the Taganrog Boilermaking Plant “Krasny Kotelshchik” (TKZ) being part of the Power Machines company. Gazprom Neft commissions new refuelling complex at Koltsovo International Airport, EkaterinburgАвгуста 15, 2016Gazpromneft Aero, operator of the Gazprom Neft aviation refuelling business, has commissioned a new refuelling complex at Koltsovo International Airport, Ekaterinburg. First Solar Wins 160MW of Module Contracts in TurkeyАвгуста 12, 2016First Solar, Inc. announced that it has booked 160 Megawatts DC of photovoltaic module sales in Turkey in the first half of 2016. The orders were placed by Basariarge Enerji A.S. and Zorlu Enerji. The production volume of PJSC TATNEFT amounted to 2,380,933 tonnes of crude oil in JulyАвгуста 11, 2016In July 2016 TATNEFT Croup enterprises produced 2,410,554 tonnes of crude oil (104.6% versus July 2015, with the seven months volume amounting to 16,318,171 tonnes (104.9% versus the similar period of 2015). Equipment manufactured by Power Machines has been commissioned at Raahe TPP (Finland)Августа 10, 2016Steam turbine with a capacity of 120 MW and turbogenerator with a capacity of 110 MW manufactured by company Power Machines have been commissioned at Finnish Raahe TPP, whereof the parties – Customer and Contractor – have signed the relevant act. Gazprom Neft tests new EFP exchange trading mechanism for Russian export crude on SPIMEXАвгуста 09, 2016An EFP transaction involves exchanging a futures contract for an obligation to deliver a commodity under an OTC contract, with the contract price tied to the futures settlement price on the day of the transaction. Rosneft Performed a Historic Gasoline DeliveryАвгуста 05, 2016Rosneft Trading SA, a company of Rosneft Group, has made its first ever gasoline cargo delivery to the Asia Pacific region. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |