15 Января 2025 | среда | 15:36
|
НовостиGazprom boosting UGS capacity in BelarusНоября 02, 2015By the start of the withdrawal season their potential maximum daily deliverability will be increased by 9.7 per cent – up to 34 million cubic meters, while the operating gas reserve will be 1.07 billion cubic meters. Eesti Energia Group results for Q3 2015Ноября 02, 2015Eesti Energia sales revenues reached 171 million euros in the third quarter of 2015, decreasing by 13.3% compared to the same period in 2014. Alongside lower sales, Group EBITDA decreased by 9.3% to 67.3 million euros in Q3´2015 and net profit amounted to 31.3 million euros (-29.1% y-o-y). Enel Green Power has started construction of the new Palo Alto wind farm in the Mexican state of JaliscoОктября 31, 2015"This new wind farm is an important step towards the consolidation of EGP’s presence in Mexico, a market that has huge potential for development. Once Palo Alto is completed, our portfolio in the country will reach an installed capacity of over 600 MW,” said EGP CEO Francesco Venturini. ROSATOM considers ASEAN one of the key regions for nuclear power developmentОктября 30, 2015In Southeast Asia ROSATOM implements projects for the construction of two nuclear power units with VVER reactors in Vietnam, and also develops the Centre of Nuclear Science & Technologies. Enel turns the Leaning Tower of Pisa blue for the 70th anniversary of the United NationsОктября 30, 2015Enel has joined the global campaign to commemorate the 70th anniversary of the United Nations and is lighting up the Leaning Tower of Pisa. Algeria Marks an Increase in Oil and Gas ProductionОктября 30, 2015Algeria is a leading natural gas producer and one of the top three oil and gas producing countries on the African continent. Statoil: more gas from Troll AОктября 30, 2015The two new giant compressors that started up on the Troll A platform this month will help increase gas recovery by 83 billion cubic metres. The occasion attracted a platform visit from EEA and EU affairs minister Vidar Helgesen. Enel Russia posted a net loss of 49,660 million RUB for the first nine months of 2015Октября 30, 2015Enel Russia has published its operating results and unaudited IFRS financial results for the first nine months of 2015. Design Voltage Was Applied to the Delayed Coking Installation of the TANECO ComplexОктября 29, 2015Design voltage supply was carried out to illuminate the process units of the TANECO Complex Delayed Coking Installation (DCI). «Kazatomprom» and «Qatar Solar Energy» sets up the joint venture in the sphere of solar energyОктября 29, 2015Sinergy of two manufactures will allow raising the competitive capacity of the products on the world markets. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |