28 Ноября 2024 | четверг | 03:42
|
НовостиPrysmian supplies cables for the Niagara Wind Farm ProjectНоября 09, 2015Prysmian Group has been awarded a new order for a total value of around € 16 Million for power transmission and distribution cabling of an onshore wind farm project in the Niagara Region of North America. Rosneft proposed to Japanese partners deals with total reserves of 6 bln barrels and with a resource base of 100 bln barrelsНоября 08, 2015Rosneft Chairman of the Management Board Igor Sechin gave a key speech at the conference “Power bridge Russia – Japan”, that opened in Tokyo, Japan. Enel Green Power starts prodaction at Dois Riachos wind farm in BrazilНоября 07, 2015Enel Green Power (EGP) has connected to the grid the Dois Riachos wind farm, which is located in the state of Bahia in north-eastern Brazil and is the first part of the 118 MW Serra Azul wind power complex to start operations. Transneft Siberia Prepares Extension Facilities of Pur-Pe LODS for Bringing OnlineНоября 06, 2015Transneft Siberia, JSC has finished pumping oil into the shutoff line of Zapolyarye-Purpe oil trunk pipeline being under construction. This 3,170-kilometer-long section is intended to direct a stream of oil into the tank farm of Pur-Pe LODS. New report reveals multibillion dollar new vehicle component marketНоября 06, 2015Energy independent electric vehicles EIV exist today and there is a multi-billion dollar opportunity for their new technology as it cascades down into all vehicles, land, water and air. Moscow Refinery begins construction of a new biological wastewater treatment complex, “Biosfera”Ноября 06, 2015The Gazprom Neft Moscow refinery has begun construction of a cutting-edge biological treatment complex, “Biosfera”. Rosatom has completed testing the polar crane at unit 4 of the Rostov NPPНоября 05, 2015Rosatom has completed testing the polar crane needed for installation of the reactor pressure vessel at unit 4 of the Rostov nuclear power plant in Russia later this month, the state nuclear corporation said on 30 October. China’s Non-Hydropower Renewable Installed Capacity Will More than Triple to 609 Gigawatts by 2025Ноября 05, 2015Cumulative installed capacity for renewables, excluding hydropower, in China will more than triple from 196.3 Gigawatts (GW) in 2015 to an estimated 608.9 GW by 2025, representing a Compound Annual Growth Rate (CAGR) of 12%, driven primarily by ambitious government targets for onshore wind. Vyborg Shipyard hosts keel-laying ceremony for first Novy Port ice-breaking supply vesselНоября 05, 2015The keel-laying ceremony for the first Arc130A Icebreaker8 ice-class vessel, built to order for Gazprom Neft, has taken place at the Vyborg Shipyard, on 3 November 2015. The vessel has been named the Alexander Sannikov. Rosneft and EGPC Signed an Agreement for Oil Products SuppliesНоября 05, 2015Rosneft and the Egyptian General Petroleum Corporation (EGPC) signed an agreement for supplies of oil products delivered by Rosneft to the Egyptian company. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |