28 Ноября 2024 | четверг | 13:54
|
НовостиRostov NPP: power №3 accepted into commercial operationСентября 30, 2015Director of the Rostov NPP Andrey Salnikov, commenting this important event, said that it was the result of a colossal work of builders, designers, commissioning and maintenance services and organizations, nuclear power plant staff. Rosgeologia eyes global offshore seismic marketСентября 29, 2015Average annual productivity of Rosgeologia’s seismic fleet in the high latitudes may total up to 2,500 km2 of 3D seismic survey and up to 50,000 line kilometers of 2D seismic survey. Gazprom going on with comprehensive efforts on import substitution by Russian prototypesСентября 29, 2015The Gazprom Board of Directors took notice of the information about the ongoing minimization of dependence on the foreign equipment supply. Bashneft commissions a new elemental sulphur production unitСентября 29, 2015Bashneft has started pilot operation of a new process line of the elemental sulphur production unit at the Bashneft-Ufaneftekhim Branch. Investments in the project totalled 2.4 billion roubles. Turboatom ready to offer its products for energy sector of ChinaСентября 29, 2015In Shanghai PRC was held the second annual conference on operation and maintenance of NPPs, joint delegation of PJSC “Turboatom” and INKLA Trading&Engineering GmbH Company, Austria took part in it. ZTR will supply thrasformer for SRPP AksuskayaСентября 29, 2015Zaporozhtransformator PJSC (ZTR) has signed the contract for supply of transformer 400 MVA, 220 kV for SRPP Aksuskaya (Aksu city, Pavlodars region, Kazakhstan). Equipment will be supplied within reconstruction project for Kazakhstan power plant stock. Enel Green Power enters Indian market by acquiring a majority stake in BLP EnergyСентября 28, 2015Enel Green Power (EGP) has today announced the acquisition of a majority stake in BLP Energy (BLP), the utility scale wind and solar subsidiary of Bharat Light & Power Pvt Ltd ("BLP Group") for a total consideration of approx. 30 million euros. Shell updates on Alaska explorationСентября 28, 2015Shell today provides an update on the Burger J exploration well, located in Alaska’s Chukchi Sea. The Burger J well is approximately 150 miles from Barrow, Alaska, in about 150 feet of water. NOVATEK’s shareholders approve interim dividendsСентября 28, 2015The Extraordinary General Meeting of Shareholders (“EGM”) of OAO NOVATEK resolved to pay dividends for the first half 2015. Enel Green Power inaugurates Italy’s first storage facility for renewablesСентября 25, 2015Enel Green Power has inaugurated the first power storage facility for renewable energy plants in Italy in Catania, Sicily. The 1MW/2MWh storage system has been connected to EGP’s 10 MWp Catania 1 photovoltaic plant. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |