29 Ноября 2024 | пятница | 04:38
|
НовостиGeometric Takes the “Aba Problem” To BuhariИюня 22, 2015Geometric Power, led by Barth Nnaji, the former Nigerian Minister of Power, has approached the Buhari government to intervene in its challenge of access to its concession area. Sahara Now Owns 18% of OML 18Июня 22, 2015With its purchase of 40% of Eroton, Sahara Group effectively owns 18% of the Oil Mining Lease (OML) 18. Sahara bought into Eroton as that company finalized its purchase of the 45% equity in the asset belonging to Shell, TOTAL and ENI. Orca Starts Songo Songo Field Workover, New Drilling In SeptemberИюня 22, 2015Orca exploration expects to start executing the offshore phase of the development programme for the Songo Songo gas field in September 2015. Chevron Moves to Sell Stakes In Two Nigerian Offshore AcreagesИюня 22, 2015Chevron has commenced the process of divesting its 40% in Oil Mining Leases (OMLs) 86 and 88, located in shallow waters at the mouth of the current Niger Delta Basin. Gazprom and Sovcomflot address strategic cooperationИюня 22, 2015A working meeting between Alexey Miller, Chairman of the Gazprom Management Committee and Sergey Frank, Director General of Sovcomflot took place today within the St. Petersburg International Economic Forum 2015. A fish pass was opened at the Nizhne-Tulomskaya HPPИюня 22, 2015A fish pass was opened at the Nizhne-Tulomskaya HPP of JSC TGC-1. It is a unique hydraulic structure that was designed for seasonal salmon spawning. Gazprom and VNG are jointly implementing the Katharina UGS construction project in GermanyИюня 22, 2015At present, four caverns with the aggregate working capacity of over 210 million cubic meters are operational within the UGS facility. In 2017 Katharina will have seven caverns. By that time, the aggregate capacity will exceed 600 million cubic meters, while the daily withdrawal capacity will reach 26 million cubic meters of gas. TGC-1 reduced significantly environmental emissions during productionИюня 22, 2015Proceeding from results of the first quarter 2015, TGC-1’s environmental emissions reduced by 7.5% to the similar 2014 period, substances emissions into waters reduced by 33.8%. None of 54 power plants has shown excess of set environmental norms. Gazprom and LUKOIL sign gas supply agreementsИюня 22, 2015A working meeting between Alexey Miller, Chairman of the Management Committee and Vagit Alekperov, President of LUKOIL took place within the St. Petersburg International Economic Forum 2015. Spillway renovation to start at the Nizhne-Tulomskaya HPP of TGC-1Июня 22, 2015Major spillway renovation is starting at the Nizhne-Tulomskaya HPP of JSC TGC-1. From June 8, 2015, vehicles will no longer be allowed to drive through the dam because of the work. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |