22 Января 2025 | среда | 10:06
|
НовостиNorth versionНоября 05, 2014This refers to Uralmash 3D-76 drilling unit, which is being prepared for mobilization to the North. Turbines started working in synchronous mode at Dnestrovskaya PSPPНоября 05, 2014The President of Ukraine Petr Poroshenko implemented simultaneous launch of two hydrounits of Dnestrovskaya PSPP with hydraulic machines manufactured by OJSC "Turboatom". Igor Sechin Held Talks on the Development of the Cooperation with the People's Republic of ChinaНоября 05, 2014Rosneft Head Igor Sechin held talks on the development of the strategic cooperation with the People's Republic of China in Beijing. Environmental standardНоября 05, 2014Following the requirements of the international regulations starting from January 1, 2015 Belarusian gas-filling stations are shifting to selling diesel fuel of environmental class K5 only, which refers to the winter type, as well as to the summer one. Naftogaz executes agreed $1.45 billion transfer to GazpromНоября 05, 2014Naftogaz of Ukraine has transferred $1.45 billion to Gazprom following the trilateral agreement signed between Ukraine, Russia and the European Commission last week in Brussels. Turboatom is modernizing the equipment for Novovoronezhskaya NPPНоября 05, 2014OJSC "Turboatom" and OJSC "Concern Rosenergoatom" (Russia) signed the contract for the modernization of turbine equipment at the unit No. 5 (station No. 14) of Novovoronezhskaya NPP. Belorusneft tests innovative method of oil production stimulationНоября 05, 2014It presupposes acid fracturing of the bench with strengthening of the etched channels using proppanat. New method was tested on well No.132s2 of Marmovichskoe deposit that had already been put into production and its rate of recovery has almost tripled. RusHydro moves up to 130th position in 2014 Platts Top 250 Global Energy Company RankingsОктября 31, 2014JSC RusHydro (ticker symbol: MOEX, LSE: HYDR; OTCQX: RSHYY) has moved from 233rd position to 130th among the world’s leading energy companies in 2014 Platts Top 250 Global Energy Company Rankings. Power Machines to renovate boiler units at Nizhnekamskaya TPPОктября 31, 2014Power Machines OJSC and Tatneft JSC have signed a contract to renovate, on a turn-key basis, four power boiler units at Nizhnekamskaya TPP, that are used to burn pet coke dust from TANEKO OJSC delayed coking unit. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |