22 Января 2025 | среда | 21:03
Energoterra

Новости

ZTR has signed a contract with FNC UPS

Октября 07, 2014

“Zaporozhtransformator” PJSC has signed a contract for delivery of autotransformer rated for power 200 MBA, voltage class 330 kV for “Federal Network Company of the United Power System” JSC (“FNC UPS”).

DNV GL cooperation with industry to address risks from offshore carbon dioxide pipelines

Октября 07, 2014

Offshore carbon dioxide (CO2) pipelines could potentially pose a risk for offshore infrastructures, ships and the marine environment.

ZTR transformers and reactors will be delivered to Jordan

Октября 06, 2014

Transformers and reactors manufactured by “Zaporozhtransformator” (ZTR) PJSC will be delivered to Jordanian

Russia's fast reactor members club

Октября 06, 2014

Rosatom is offering "early bird" incentives to join its International Research Centre based on the multipurpose sodium-cooled fast neutron research reactor, or MBIR by its Russian acronym.

«Sumy Frunze NPO» participated in the International Exhibition Oil & Gas Warsaw

Октября 06, 2014

The Company exhibited at this forum for the first time, however was not lost among the venerable participants. Frunze stand was visited by the vast majority of key players of Polish oil and gas market, who expressed their interests in cooperation with Sumy Frunze engineers.

Belorusneft continues developing of crude operation from tight gas reservoirs

Октября 06, 2014

Another sidetrack was drilled on Rechitskoye deposit well No. 204g based on recommendation of geological survey division of BelNIPIneft R&D institute.

The findings of analysis of the state of competition on the wholesale market of residual oil

Октября 06, 2014

The Federal Antimonopoly Service (FAS Russia) analyzed the state of competition on the wholesale market of residual oil in 2011 - 2013.

In 2014 Company “Quadra - Power Generation” Will Assign RUR 60 Mn for Construction of New Block-Modular Boiler Room in the City of Lebedyan

Октября 06, 2014

The new boiler room will supply heat and hot water to more than 80 facilities – residential houses, administrative buildings, social and cultural facilities. This year, the company will assign RUR 60 mn for the boiler room construction.

ZTR transformer for Argentina was successfully tested

Октября 06, 2014

Transformer rated for power 300 MVA, voltage class 500 kV for interstate Argentina-Uruguay power company CTM Salto Grande was successfully tested by “Zaporozhtransformator” (ZTR) PJSC.

Belarusian gas-processing plant has raised the quality of liquid gas up to the European standard

Октября 06, 2014

Starting from October 1 liquid gas of Belarusian production corresponds to I grade of copper corrosion factor.

1 . . . 310 311 312 313 314 315 316 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine