22 Января 2025 | среда | 18:45
Energoterra

Новости

Kazakhstan removes research reactor HEU

Октября 09, 2014

Kazakhstan has removed a stockpile of Russian-origin fresh high-enriched uranium (HEU) fuel from the critical assembly of the WWR-K Research Reactor in Almaty, the International Atomic Energy Agency (IAEA) said yesterday.

ROSATOM starts development of medium nuclear power generation in Russia

Октября 09, 2014

ROSATOM launches a program of small and medium nuclear power generation development in Russia. The corresponding decision of principle was made at the level of top management of the state corporation, Deputy CEO of ROSATOM Vyacheslav Pershukov says.

Gazprom and Belgian Fluxys consider prospects for cooperation deepening

Октября 09, 2014

A working meeting took place today between Alexey Miller, Chairman of the Gazprom Management Committee and Walter Peeraer, Chief Executive Officer of Belgian company Fluxys in the frames of the 4th St. Petersburg International Gas Forum.

Daily oil output on Verkhnechonskoye field reached historical maximum

Октября 09, 2014

Verkhnechonskneftegaz finished construction of oil treatment plant (UPN-1), as a result its daily oil output reached 22.5 thousand tons. This is the highest rate of the Verkhnechonskoye field since the start of its commercial operation.

Gazprom and Argentina address potential of joint gas projects

Октября 08, 2014

A working meeting took place between Alexey Miller, Chairman of the Gazprom Management Committee and Debora Giorgi, Industry Minister of the Argentine Republic as part of the 4th St. Petersburg International Gas Forum.

RusHydro announces tender to select general contractor for construction of Sakhaliskaya TPP-2

Октября 08, 2014

JSC RusHydro (ticker symbol: MOEX, LSE: HYDR; OTCQX: RSHYY) announces that its subsidiary Sakhalinskaya TPP-2 has launched an open tender for selection of a general contractor for construction of Sakhalin TPP-2.

Appointment of new CEO of Eesti Energia

Октября 08, 2014

Supervisory Council meeting held on 2 October 2014 passed the resolution subject to which Mr Hando Sutter was appointed as the new Chief Executive Officer and Chairman of Management Board of Eesti Energia until 30 November 2017, effective as of 1 December 2014.

Gazprom Neft Moscow Refinery begins production of granulated sulphur

Октября 08, 2014

New facilities for the production of granulated sulphur have been brought into production at the Gazprom Neft Moscow Refinery.

Transneft maintains its technical capability to export oil by the oil pipeline to Primorsk at the level of 60 million tons a year

Октября 08, 2014

The pipeline to Primorsk retains its capacity to export oil at the level of 60 million tons of oil a year, though it has been partially repurposed to provide transportation of diesel fuel for export, Vladimir Nazarov, Deputy Vice President of Transneft, JSC, said at the press-conference.

Paks moving to 15-month fuel cycle

Октября 08, 2014

TVEL reports it is supplying Paks with a second-generation fuel that will allow it to extend its operational cycles. The first fuel load is 12 assemblies.

1 . . . 308 309 310 311 312 313 314 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine