23 Января 2025 | четверг | 06:31
Energoterra

Новости

Gazprom consistent in its activities to prevent corporate corruption

Сентября 18, 2014

The Gazprom Board of Directors took notice of the information about the activities aimed at preventing corporate corruption.

Intergovernmental agreement for South Stream in Republika Srpska to be ready soon

Сентября 17, 2014

The Gazprom headquarters hosted a working meeting between Alexey Miller, Chairman of the Company's Management Committee and Milorad Dodik, President of Republika Srpska.

Enel among three utilities confirmed in the Dow Jones Sustainability Index World and Europe

Сентября 17, 2014

For the eleventh year in a row, in 2014/2015, Enel will be admitted to the Dow Jones Sustainability World Index (DJSI World) and to the Dow Jones Europe Index.

RusHydro successfully completes stabilization of Zagorskaya pump storage plant-2

Сентября 17, 2014

JSC RusHydro announces that it successfully completed the stabilization of the Zagorskaya pump storage plant (PSP) no. 2 after the incident a year ago.

Gazprom addresses relationships with Ukraine in gas sector

Сентября 17, 2014

The Board of Directors addressed the information about the state and prospects for the relationships between Gazprom and Ukrainian business entities in the gas sector.

FGC UES and Rosneft commission two substations for Vankor power supplies

Сентября 16, 2014

The commissioning of new power plants Arsenal and Mangazeya in Purov district of the Yamalo-Nenets Autonomous Territory has taken place, which will provide permanent power supply of Vankor gas field.

Igor Sechin and Khanty-Mansiysk Autonomous District Governor Discussed Cooperation

Сентября 16, 2014

Rosneft head Igor Sechin held a meeting with Khanty-Mansiysk Autonomous District-Yugra Governor Natalia Komarova.

Power Machines is the only Russian company licensed to design and manufacture high-speed and low-speed turbines for NPP applications

Сентября 16, 2014

Having reviewed the supporting documents submitted by the power engineering company, the Federal Service for Environmental, Technological and Nuclear Supervision (Rostekhnadzor) confirmed Power Machines’ right to design and manufacture high-speed and low-speed turbines for NPP applications.

RN Amur – a Sophisticated Tow Boat – Was Put into Operation at RN-Nakhodkanefteprodukt Oil Terminal

Сентября 16, 2014

A new tow boat RN Amur, constructed against Rosneft order at the Khabarovsk shipbuilding facility (Far Eastern Shipbuilding and Ship repair center subsidiary), proceeded to carriers mooring at Nakhodkanefteprodukt oil terminal.

A new power unit with equipment from Power Machines put into service at Vladimirskaya TPP-2

Сентября 16, 2014

A new 230 MW combined-cycle power plant (CCPP) with a gas turbine, manufactured and supplied by Power Machines, was launched at Vladimirskaya TPP-2.

1 . . . 318 319 320 321 322 323 324 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine