23 Января 2025 | четверг | 04:08
|
НовостиEnergy market overview in August 2014Сентября 19, 2014Electricity August Day-Ahead market prices lower than July in Estonia, Latvia and Lithuania, but higher than in earlier months. Estonian enterprises prefer fixed price electricity contracts. Gazprom supplying gas to Europe in line with contractual obligationsСентября 19, 2014A working meeting between Russian President Vladimir Putin and Gazprom Management Committee Chairman Alexey Miller took place. Turboatom has completed shipping a condenser for the unit No. 4 of Rostovskaya NPPСентября 18, 2014OJSC "Turboatom" has shipped 6 modules of the condenser of the last case No. 3 for the unit No. 4 of Rostovskaya NPP (Russia) under construction. ROSATOM Deputy CEO Nikolay Spasskiy visited the site of Kudankulam NPPСентября 18, 2014Deputy CEO of ROSATOM Nikolay Spasskiy (India) held in Mumbai expanded consultations with heads of the Department of Atomic Energy of the Government of India and the Nuclear Power Corporation of India Ltd. (NPCIL). A new power unit with equipment from Power Machines put into service at Kirovskaya TPP-3Сентября 18, 2014A new 230 MW combined-cycle power plant (CCPP) with a gas turbine, manufactured and supplied by Power Machines, was launched at Kirovskaya TPP-3 on 31 July. Raspadskaya launches a 2.7 million tonne coking coal longwallСентября 18, 2014OJSC Raspadskaya announces launch of longwall 5а -7-28 bis. Commercial coal reserves in the longwall 5а-7- 28 bis measure 2.7 million tonnes, with the panel of coal 254 m long and extraction column 1,914 m long. Power engineers proceed to building turboset and cooling tower foundations for Blagoveshchenskaya TPP Phase 2Сентября 18, 2014Blagoveshchenskaya TPP CJSC (subsidiary of JSC RusHydro– the owner/developer of project phase 2 – is controlled by JSC RAO Energy System of East) has proceeded to casting turboset and cooling tower foundations. Rusatom Overseas engages world’s leading experts to create new generation desalination facilitiesСентября 18, 2014World’s leading experts on desalination technologies joined the Rusatom Overseas Expert Council on Desalination that had its first meeting on September 17 in Moscow. Natural gas – most sustainable energy sourceСентября 18, 2014The Gazprom Board of Directors took note of the information about the outlook for natural gas competitiveness in the global energy mix including coal. Enel Green Power has begun construction of the new wind farm “Talinay Poniente”Сентября 18, 2014Enel Green Power (“EGP”) has begun construction of the new wind farm “Talinay Poniente”, which will be composed of 32 wind turbines for a total installed capacity of 61 MW. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |