07 Февраля 2025 | пятница | 00:56
|
НовостиDTEK increased coal exports by 68.1% YoY to 1.17 million tonsМая 16, 2014In March 2014, DTEK exported its largest monthly volume of coal. Gazprom Neft reports IFRS financial results for 1Q 2014Мая 16, 2014Gazprom Neft today announces its consolidated financial results for 1Q 2014, prepared in accordance with International Financial Reporting Standards (IFRS). The support to construction of Russian-Finnish NPP Hanhikivi-1 in Finland remains to be strongМая 16, 2014The support to construction of Russian-Finnish NPP Hanhikivi-1 in Finland remains to be strong. This was reported to ITAR-TASS by Mrs. Minna Forsstrem, the project director of Fennovoima engaged in the NPP construction jointly with Rosatom. Dismantling of Beloyarsk units beginsМая 16, 2014The dismantling of equipment at the shutdown units 1 and 2 of the Beloyarsk nuclear power plant in Russia has started. Decommissioning of the two prototype reactors is expected to take 18 years to complete. South Stream to provide for possible branch construction from Hungary to AustriaМая 16, 2014Budapest hosted a working meeting between Alexey Miller, Chairman of the Gazprom Management Committee and Viktor Orban, Prime Minister of the Republic of Hungary. Certification of Integrated Management System in Rusatom Overseas JSC has been successfully completedМая 16, 2014The certification audit of the integrated management system in Rusatom Overseas JSC for compliance with quality management (ISO 9001:2011), environmental management (ISO 14001:2004) and occupational health and safety (OHSAS 18001:2007) international standards has been successfully completed. DTEK decreased electricity supply by 3.1% to 12.9 billion kWh in 1Q 2014Мая 15, 2014DTEK announced its performance results for 1Q 2014. DTEK’s enterprises produced 10.4 million tons of coal (+1.7% YoY), generated 12.9 billion kWh of electricity (-3.1%), transmitted 14.8 billion kWh of electricity via grids (-4%), and produced 165.9 million cubic meters of natural gas. Rosneft and Sinopec cooperate as part of Sakhalin-3 and Udmurtneft projectsМая 15, 2014As part of the preparations for the visit of the Russian Federation President Vladimir Putin to China, Rosneft President, Chairman of the Management Board Igor Sechin held a meeting with Fu Chengyu, Chairman of China Petroleum and Chemical Corp (Sinopec) 15 May 2014 in Beijing. Integrated modernization of Palyeozerskay HPP by TGC-1 is expected to take two yearsМая 15, 2014On May 15, 2014, a preparation stage of the 2-year equipment modernization campaign was completed at Palyeozerskay HPP included to the Chain of Sunskie HPPs operated by TGC-1 JSC. Yuzhno-Kirinskoye gas reserves increased 13 per cent – to 636.6 billion cubic metersМая 15, 2014On the threshold of Gazprom's annual General Shareholders Meeting the Company's headquarters hosted the Press Conference “Mineral and Raw Material Base Development. Gas Production. Gas Transmission System Development”. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |