04 Февраля 2025 | вторник | 19:45
|
НовостиRusHydro launches new 640 MW hydro-unit at the Sayano-Shushenskaya hydropower plantДекабря 21, 2013JSC RusHydro announces that a new 640 MW hydropower unit was commissioned and put into commercial operation at the Company's Sayano-Shushenskaya hydropower plant. Mechel Signins Agreements for Restructuring Part of Debt to SberbankДекабря 21, 2013Mechel announces signing agreements with Sberbank of Russia on restructuring a part of Mechel OAO’s debt to the bank (25.5 billion rubles, approximately 773 million US dollars). Biogas power station Luchki has begun to use new feedstock type after the set of experiments with laboratorial biogas unitДекабря 20, 2013The country’s largest biogas power station “Luchki” has begun the application of new feedstock of vegetable origin – sorghum. "Turboatom" is implementing new turning machinesДекабря 20, 2013The specialists of OJSC "Turboatom" perform erection and commissioning works of three new turning machines with program control of Haas company (USA). SUEK Employees Transfer Over RUR20m to Far East Flood VictimsДекабря 20, 2013In 2013, five areas of the Russian Far East were concurrently overrun by a devastating deluge flooding 12,000 houses that used to be homes for almost 170,000 people. Summary of ROSATOM’s TVEL Fuel Company economic activities in 2013Декабря 20, 2013Preliminary estimates of ROSATOM’s TVEL Fuel Company’s 2013 financial and economic performance show 16.8% EBITDA growth as compared to that of 2012 (RUB 42,668 mln in 2012); 14% growth in net income (RUB 19,642 mln in 2012); and 7.7% growth in sales proceeds (RUB 121,958 mln in 2012). Krasny Kotelshchik has completed shipment of equipment for Starobeshevskaya TPPДекабря 20, 2013The Taganrog Boiler-Making Works "Krasny Kotelshchik", a member of the power plant concern OJSC Power Machines, has shipped the last product shipment for modernization of the Boiler TP-100 of the Unit No.12 of Starobeshevskaya TPP (Ukraine). Gazprom Neft’s Board of Directors Reviews 2013 Inital Results and Future ProjectsДекабря 20, 2013Gazprom Neft’s Board of Directors has reviewed the initial results of the 2013 investment programme and budget as well as plans for 2014. In the current year the Company's production is expected to reach 62.2 million tonnes of oil equivalent, a 4.3 % increase over 2012. Krasny Kotelshchik has completed shipment of equipment for CHPP-20 of MosenergoДекабря 19, 2013The Taganrog Boiler-Making Works "Krasny Kotelshchik", a member of the power plant concern OJSC Power Machines, has shipped the last assemblies of the HRSG for PGU-420Т of CHPP-20, the branch of PJSC Mosenergo. Inter RAO Group Takes Long-Term Loan Guaranteed by German Export Credit AgencyДекабря 19, 2013Inter RAO Group and ING Bank, a subsidiary of ING DiBa AG, signed a €48.4 million loan agreement with maturity over ten years to refinance the delivery of Siemens equipment for Power Generation Unit 2 of Yuzhnouralskaya TPP-2 currently under construction. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |