27 Января 2025 | понедельник | 20:19
|
НовостиFirst Enel Green Power wind farm in Mexico enters operationИюля 11, 2012Enel Green Power (EGP) has started operations at its first wind farm in Mexico, Bii Nee Stipa II. The plant, which leverages on the excellent wind resources that characterise the Isthmus of Tehuantepec, located in the Mexican State of Oaxaca, has a load factor of around 40%. TNK-BP / PDVSA JV in Venezuela Reaches Oil Production Target of 130,000 Barrels per DayИюля 10, 2012PetroMonagas, a joint venture between TNK-BP (16.7%) and Venezuelan state company PDVSA (83.3%), has increased its production of viscous oil by 11% since the start of the year to the target level of 130,000 barrels per day. Drilling of Prospecting and Appraisal Well Begins at Sakhalin-3 Veninsky License BlockИюля 10, 2012Drilling of prospecting and appraisal well No.3 has begun at the North-Veninskaya formation in the Veninsky license block, a part of the Sakhalin-3 project. The KANTAN 6 jack-up drilling rig is drilling the well, which has a planned measured depth of 3,830 metres and vertical deviation of 750 metres. Pilot development work has begun at the Messoyakha oil fieldИюля 06, 2012The drilling of the first operating well at the Messoyakha field is underway. The well, which is due to be completed in July, will be 1,800 metres deep. Bashneft and Lukoil will invest 8 billion roubles in the R. Trebs and A. Titov oilfield developmentИюля 06, 2012At the scheduled meeting, the Board of Directors of JSOC Bashneft considered the implementation of the R. Trebs and A. Titov oilfield development programme in the Nenets Autonomous District and the prospects for the programme implementation for 2012. ARMZ: Uranium production has increased by 37% - from 5,173.4 tons to 7,091.2 tons in 2011Июля 06, 2012ARMZ Uranium Holding (JSC Atomredmetzoloto, ARMZ) has published the consolidated financial statements for 2011 in accordance with the international standards, the independent auditor’s opinion prepared by KPMG and the production indicators for 2011. Pskovenergo will carry out unique works for laying a cable line over the Velikaya River in PskovИюля 05, 2012In July Pskovenergo branch of IDGC of the North-West, JSC will commence implementation of the project for the 6 kV overhead line changeover to cable design. Gazprom and Gasunie develop Sci-Tech CollaborationИюля 04, 2012The Hague (The Netherlands) has hosted the fifth meeting of the Coordination Committee for Sci-Tech Collaboration between Gazprom and Gasunie. Enel Green Power starts operations at Rocky Ridge wind farm in Oklahoma, USAИюля 04, 2012The new wind farm has a total installed capacity of 150 MW. The fully operating plant will produce more than 600 million KWh per year. “Krasny Kotelschik” shipped the equipment for Ekibastuzskaya SDPP-1Июля 03, 2012“Krasny Kotelschik” (the main production activity of JSC “EMAlliance” the affiliate of the power machine building group “Power Machine”) manufactured the next lot of the equipment for Ekibastuzskaya SDPP-1 (Kazakhstan). |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |