23 Января 2025 | четверг | 08:58
|
НовостиGazprom Neft starts drilling in IraqНоября 27, 2011On 24 November, drilling of the first appraisal well in the Iraqi Badra oil deposit, operated by Gazprom Neft, commenced. The depth of the appraisal well will reach 4,900m. Drilling is expected to be completed in April 2012. TATNEFT Has Improved Mean Time between Failures of Wells OperationНоября 25, 2011As of November 1, 2011 the total mean time between failures (MTBF) of the wells operation at OAO TATNEFT reached the level of 1136 days. The mean time between failures is an estimated figure of the wells operation and the operation of downhole pumping systems. HMS Group put into operation unique testing facility to increase R&D capacitiesНоября 25, 2011HMS Group has launched one of the most powerful testing facilities in Europe to conduct field tests of pumping equipment. This event was attended by the President of Ukraine Viktor Yanukovych, heads of relevant Ukraine ministries, representatives of the major clients such as Transneft, Russian oil-trunk pipelines operator, Rosatom, Russian state-owned nuclear operator, as well as representatives of investment community. Execution of the Resource Saving Program in the Third Quarter of 2011Ноября 23, 2011The economic effect of carrying out the activities of OAO TATNEFT's resource saving program amounted to 620 million rubles in the third quarter of the current year. Energy resources savings amounted to 26,271 tons of standard fuel making 170% to the annual plan. Нефтяники встретились с экологамиНоября 22, 2011По инициативе «Штокман Девелопмент АГ» (ШДАГ) и Российского представительства Всемирного фонда дикой природы (WWF России) состоялось очередное рабочее совещание, посвященное вопросам экологической безопасности в ходе освоения Штокмановского месторождения. One Hundred Thousandth Ton of Extra-Viscous Oil Produced at Ashalchinskoye Field of TATNEFTНоября 15, 2011100, 000-th ton of extra-viscous oil (EVO) has been produced at Ashalchinskoye field of OAO TATNEFT since the beginning of its development. Enel Distribuzione: Italy’s first smart grid in IserniaНоября 14, 2011Enel Distribuzione has begun installing the first smart grid in Italy, and one of the first in Europe, in Isernia. The technology installed will make it possible to optimally regulate the bi-directional flow of electricity generated from renewable resources on low and medium-voltage networks and will enable new uses of energy. A total investment of 10 million euros is projected for this Molise pilot project”. ROSATOM establishes a systems integrator for NPP servicingНоября 12, 2011ROSATOM establishes a systems integrator for servicing NPPs located abroad, Rusatom Service. Founders of the new company which was registered late October 2011 are Rosenergoatom Concern (51%), Atomenergomash (16%), Gidropress (16%) and Atomtekhenergo (16%). Sorochinskneft to Allocate in Excess of 90 mln Rubles for Oil Sludge Utilization by the End of 2012Ноября 12, 2011'Oil sludge and drilling waste processing projects as well as drilling site remediation are an important part of our efforts to implement a large-scale environmental protection program', said Alexander Loginov, Director, Health, Safety and Environment Department, Sorochinskneft. New Technologies of Wells Stimulation and Water ShutoffНоября 09, 2011A lot of attention is paid today at OAO TATNEFT to combined treatment of bottom-hole zone of productive strata and to water shutoff works. Especially important is the development of multi-purpose, energy and resource-saving technologies. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |