23 Января 2025 | четверг | 15:09
|
НовостиTNK-BP sums up its 2011 results in retailДекабря 15, 2011The company’s retail executives told a press conference held in a Wild Bean Cafe, a new pilot project the company is currently implementing, of its preliminary 2011 results and 2012 plans. TNK-BP Signs Contract with Transneft for Transportation of Oil through the Zapolyarye-Purpe PipelineДекабря 14, 2011TNK-BP announces that it has signed a long-term contract with OJSC Transneft for the transportation of oil through the Zapolyarye-Purpe pipeline, which will connect Yamal fields with the East Siberia–Pacific Ocean oil pipeline. Nord Stream Pipeline Temporarily Shut Down for Planned Maintenance of Russian Onshore ConnectionДекабря 14, 2011From 13 December, 6 am CET to 15 December, 6 pm CET, the gas flow through the Nord Stream Pipeline will be temporarily suspended due to planned maintenance works at Gazprom's connecting pipeline. Industrial Washing of Elga Sample Confirms High Quality of Deposit’s Coking CoalДекабря 14, 2011Mechel OAO (NYSE: MTL), one of the leading Russian mining and metals companies, announces that Southern Kuzbass Coal Company’s washing plant produced first coking coal concentrate out of the Elga deposit’s coal. 13 transformers will be manufactured by ZTR for IndiaДекабря 13, 2011PJSC “Zaporozhtransformator” (ZTR) included into consortium with Indian company Transformers & Rectifiers (India) Ltd signed contracts on the delivery of single phase autotransformers with state network company Power Grid Corporation of India Ltd. Rosneft Takes an Important Step in Expanding into the Strategic Market of VenezuelaДекабря 13, 2011Rosneft and PDVSA signed a tentative memorandum of understanding to set up a joint venture to develop heavy crude oil reserves in Venezuela as part of the Carabobo-2 project. TATNEFT Has Established a New CompanyДекабря 13, 2011TATNEFT has established a new company under the name of OOO INCO-TEK which will specialize in engineering for TANEKO, as well as for other refining and petrochemical projects. «Turboatom» completes the reconstruction of the eighth block of Kurakhovskaya TPP (Ukraine)Декабря 12, 2011It is going to complete shipment of units of updating for block No 8 of Kurakhovskaya TPP. The customer was taken control assembly of middle pressure cylinder (MPC) with rotor (MPR) Alstom to supply the boiler and turbine hall for a new highly efficient 900 MW coal-fired power plant in PolandДекабря 12, 2011Alstom has been awarded a contract worth approximately €900 million by Elektrownia Rybnik S.A. (ERSA) to supply the core power generation equipment for a new 900 MW coal-fired power plant to be built at the Rybnik site in Poland. Results of NOVATEK’s Corporate Strategy Day PresentationДекабря 12, 2011NOVATEK held its Corporate Strategy Presentation in London, where the Company’s senior management provided operational guidance for production and capital expenditures through 2020, an update on the Yamal LNG project as well as a review of NOVATEK’s performance and strategy implementation to date. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |