23 Января 2025 | четверг | 02:04
|
НовостиHMS Group completes preventive maintenance at gas refineries of TNK-BP and SiburАвгуста 18, 2011PJSC “Nizhnevartovskremservice”, a subsidiary of the HMS Group, completed preventive maintenance at Nizhnevartovsk and Byelozersk gas refineries. HMS Group to manufacture series of group measure units for ТNК-BPАвгуста 16, 2011Nizhnevartovskremservice, a subsidiary of HMS Group, has won a tender to supply TNK- BP holding with series of automated group measure units. FMC Technologies to Supply Subsea Systems for Shell's Prelude ProjectИюня 30, 2011FMC Technologies, Inc. announced that it has signed an agreement with Shell Development (Australia) Pty. Ltd. to supply subsea production and associated topside systems for the Prelude field development. Enel Green Power starts up a further MW in Spain and PortugalИюня 30, 2011In Spain the Aguilón 50 MW wind farm is located in the province of Zaragoza and will have an estimated output of 139,300 MWh a year, equivalent to the consumption of 51,500 households In Portugal, an additional 4 MW from the second phase of the Alvaiareze wind farm will meet the energy consumption of 3,900 households. “Turboatom" completed participation in large-scale reconstruction of unit of Aksu TPPИюня 30, 2011At Aksu TPP (Kazakhstan) held a ceremonial commissioning of unit No 2 with turbine K-325-23, 5 made by OJSC "Turboatom" (Ukraine). Power unit was put into commercial operation, regarding this appropriate certificate was signed. Gazprom and Foundation Project Delta Group hold first meeting of Joint Steering CommitteeИюня 30, 2011The Blue Corridor project stipulating mass production of natural gas vehicles will help considerably reduce fuel costs, mitigate negative environmental impacts and diversify natural gas applications. Mechel: Power Segment Output For The 1Q 2011Июня 30, 2011Mechel‘s power segment‘s revenue from external customers in 1Q 2011 comprised $225.1 million, or 7.7% of consolidated net revenue, an increase of 21.4% compared with the segment‘s revenue from external customers of $185.4 million or 9.8% of consolidated net revenue in 1Q 2010. BLM Approves Next Phase of Construction at Ivanpah Solar Electric Generating SystemИюня 30, 2011The Bureau of Land Management (BLM) issued a Notice to Proceed for the Ivanpah Solar Electric Generating System (ISEGS), providing approval for ISEGS’ EPC partner, Bechtel Power Corporation, to resume the next phase of construction at Ivanpah. Russia proposes to the countries to perfect the stress-tests for NPPs in collaborationИюня 30, 2011Russia proposes other countries to perfect the stress-tests at the nuclear plants in collaboration. Rosatom General Director Sergey Kiriyenko reported it when appearing at the Ministerial Conference of IAEA, dedicated to the events at Fukushima-1 NPP. Sovcomflot and Vnesheconombank sign a cooperation agreement for the Yamal LNG projectИюня 30, 2011Russia’s largest tanker company Sovcomflot and the State corporation “The Bank for Development and Foreign Economic Affairs (Vnesheconombank)” signed a bilateral agreement on cooperation. The document was signed by SCF’s President and CEO Sergey Frank and Vnesheconombank’s Chairman Vladimir Dmitriev. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |