29 Ноября 2024 | пятница | 17:48
Energoterra

Новости

Regular meeting of EuRoPol GAZ Supervisory Board held

Января 26, 2011

The Supervisory Board of EuRoPol GAZ held a meeting in the city of Zakopane (Poland) today. The meeting was moderated by Alexander Medvedev, Deputy Chairman of the Gazprom Management Committee

Statoil identified for pre-salt operatorships in Angola

Января 26, 2011

The national oil company Sonangol has publicly announced that the Angolan jury of the bid rounds has elected Statoil for operatorship and participation in several pre-salt blocks offshore Angola. Statoil has submitted its proposal as part of the pre-salt restricted public bid round organised by Sonangol for access to pre-salt acreage in the Kwanza Basin in Angola. Statoil’s proposal includes operatorship of Blocks 38 and 39 and participation in Blocks 22, 25 and 40 with a comprehensive work program and a signature bonus for each block.

Gazprom and SOCAR agree to increase Azerbaijani gas purchases

Января 26, 2011

Saint Petersburg hosted a working meeting between Alexey Miller, Chairman of the Gazprom Management Committee and Rovnag Abdullayev, President of the State Oil Company of Azerbaijan Republic (SOCAR).

IDGC North-West formed, trained and equipped 130 emergency and recovery teams composed (784 persons)

Января 26, 2011

To ensure power supply to consumers in the North regions, in case of unscheduled outages, IDGC North-West has 86 own redundant power supply sources, including 60 mobile and 26 stationary diesel generators.

Gazprom and Bulgargaz discuss progress with the South Stream project

Января 26, 2011

The Gazprom headquarters hosted a working meeting between Alexey Miller, Chairman of the Company's Management Committee and Dimitar Gogov, Executive Director of Bulgargaz EAD.

Completion Rate of Construction Works at Zagorskaya PSPP-2 Facilities Reached 45%

Января 25, 2011

Since the year beginning, the works at the Zagorskaya PSPP-2 under construction in Sergiev-Posad region of the Moscow Oblast have entered a new phase. The contractors started installing the basic embedded parts of the pump turbine unite: cone and foundation ring, stator and spiral case of starter units No.1 and 2. Completion of this construction stage will allow to begin installation of the hydroelectric units' working gear.

In 2010 Slavneft produced 18.4 mln tons of oil

Января 25, 2011

In 2010, ОАО NGK Slavneft’s subsidiaries produced 18.4 mln tons of oil under the Business Plan what makes 97.2% against 2009. The gas production volume exceeded the planned indicator by 4.5% and amounted to 851.9 mln m3 (94% as compared to 2009).

Kaiga NPP-4 (India) with the equipment of OJSC "Turboatom" gains power

Января 25, 2011

Ongoing commissioning of the NPP Kaiga-4 in India. This is the latest fourth turbine to the contract signed with the National Nuclear Power Corporation of India in 2002.

In 2010, SIBUR increased volumes of LPG production and supply to the domestic market

Января 25, 2011

Based on the company’s production figures and industry statistics, SIBUR maintains a positive outlook on the current state of the Russian market for liquefied petroleum gas (LPG) and the existing balance between domestic sales and exports.

80 percent of the wires to be replaced during repair works in 2011, at a branch of IDGC North-West "Karelenergo”, will be replaced by self-supporting insulated conductors

Января 25, 2011

Volume of clearing of line routes will be increased to 1,635 hectares, 27 per cent more than the fact of 2010.

1 . . . 701 702 703 704 705 706 707 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine