29 Ноября 2024 | пятница | 18:38
|
НовостиMoscow Refinery Starts Producing Euro-4 Standard Diesel FuelЯнваря 28, 2011Starting from January 2011, the Moscow Refinery launched the production of diesel fuel for domestic supplies that meets the requirements of Class 4 Technical Regulations. The operations support for production of diesel fuel with sulphur content up to 50 mg/kg included Haldor Topsoe catalyst loading into the hydrotreatment unit. Balakovo NPP fulfilled the collective contract of 2010Января 28, 2011At the joint meeting of Balakovo NPP Administration and trade union committee summarizing results of the last year collective contract execution took place. Statoil Canada oil sands SAGD project produces first oilЯнваря 28, 2011Statoil 27 January announced first oil production from its Leismer Demonstration Project (LDP) after initiating steam injection in September 2010, one month ahead of schedule. SUEK denies any involvement in tacit collusionЯнваря 28, 2011OAO SUEK is investigating the information on the company's alleged involvement in cartel arrangement in the coal market provided by the Russian Federation Federal Antimonopoly Service (FAS). As a result of the tacit collusion the three parties to it earned over five million roubles, according to FAS. Rosenergoatom obtained Rostekhnadzor license for location of power units Nos. 1 and 2 of Nizhny Novgorod NPPЯнваря 28, 2011The Federal Service for Ecological, Technological and Nuclear Supervision (Rostekhnadzor) issued to Rosenergoatom Concern OJSC a license for location of power units Nos. 1 and 2 of Nizhny Novgorod NPP in Navashino district of Nizhny Novgorod region, next to the Monakovo settlement. Rosneft and ExxonMobil to Develop Black Sea ResourcesЯнваря 27, 2011Rosneft and ExxonMobil have entered into an agreement regarding joint development of oil and gas resources in the Black Sea, which includes an initial focus on oil exploration and production in the Tuapse Trough in the Russian Black Sea basin. Power Machines company is to proceed with activities to upgrade Zhigulyovskaya HPP operated by RusHydro JSCЯнваря 27, 2011RusHydro JSC and Power Machines company signed a supplementary agreement to the contract on manufacturing and supply of equipment for Zhigulyovskaya HPP’s hydraulic units (station nos. 16, 20, 8, 7, and 18). Pavlogradugol Commissioned the First in Ukraine Industrial Heat Pump Unit for Mine Water Heat UtilizationЯнваря 27, 2011The first in Ukraine and the most efficient on the former Soviet Union territory heat pump unit has been commissioned at Blagodatnaya Mine, Pavlogradugol (DTEK). Mine water heat will be used for heating and hot water supply of the coal mine. Power Machines company manufactured a turbine runner for hydraulic unit No. 1 of RusHydro JSC’s Sayano-Shushenskaya HPPЯнваря 27, 2011Power Machines company manufactured, tested and handed over to the customer’s representatives the first hydraulic turbine runner for the hydraulic unit No. 1 of Sayano-Shushenskaya HPP (SSh HPP) to be launched in December 2011. SOCAR: Two wells commissioned after total overhaulЯнваря 27, 2011Gunashli field plays an important role in oil and gas industry of the Azerbaijan Republic. New wells are drilled as well as idling ones are commissioned there after taking necessary technical measures. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |