15 Января 2025 | среда | 08:43
Energoterra

Новости

TNK-BP today reported its results for the nine months ended September 30th, 2010

Октября 26, 2010

“TNK-BP’s robust operating and financial performance this year is further evidence of the strength of our management team and excellent cooperation at the shareholder level,” said, Mikhail Fridman, Executive Chairman of TNK-BP Ltd.

Reconstruction of cable line 220 kV with innovative technologies has significantly increased reliablity of power supply in the centre of St. Petersburg

Октября 26, 2010

An affiliate to JSC FGC UES - Backbone Electric Grids (MES) of North-West has completed reconstruction of two-circuit cable electric transmission line 220 kV Chesmenskaya – Central TPP (Saint-Petersburg).

Environmental hearing on power unit No. 3 of Ekibastuzskaya GRES-2

Октября 26, 2010

Public hearing on ecologic issues in connection with Ekibastuzskaya GRES-2 project was held in Solnechny not far from Ekibastuz. The hearing was organized by the power plant with participation of COTES as the general designer.

Rotary sensors – miniaturization with maximum performance

Октября 26, 2010

The possibility of untying Gordian knots through commitment and a high level of engineering expertise is clearly demonstrated by Contelec with its miniaturized rotary sensors.

COTES visits Israel Electric Corporation (IEC)

Октября 26, 2010

COTES took part in a technical tour to Israel Electric Corporation (IEC) and to several combined-cycle plants in Israel.

EBRD buys into RusHydro Rouble Eurobond

Октября 26, 2010

The EBRD has taken up 22.5 percent of a five-year rouble bond launched by RusHydro in the Eurobond market, the first such instrument issued by a Russian power sector company, in what is a key move for developing the rouble Eurobond market.

TGC-1 announces JV agreement with Leader Asset Management to complete 450 MW CCGT project at Pravoberezhnaya CHPP in St. Petersburg

Октября 25, 2010

JSC TGC-1 and Leader Asset Management (ZAO “UK Leader”) inked a preliminary cooperation agreement to establish a joint venture (JV) and arrange project financing for the construction of 450MW CCGT-unit at Pravoberezhnaya CHPP in St. Petersburg.

OMZ-Spetsstal wins a contract for two hydraulic shafts for Sayano-Shushenskaya HPP

Октября 25, 2010

OMZ-Spetsstal, a part of OMZ Group, has won a contract for the delivery of two hydraulic turbine shafts to Sayano-Shushenskaya hydro power plant, ordered by OAO Power Machines Company.

Energy partnership of Russia and EU to be mutually beneficial

Октября 25, 2010

The town of Rust (Germany) hosted today a working meeting between Alexey Miller, Chairman of the Gazprom Management Committee and Guenther Oettinger, European Commissioner for Energy.

Eni announces successful appraisal and testing of Cabaça South East, offshore Angola

Октября 25, 2010

The appraisal and testing of the well, located in 470 meters water depth, at a distance of about 100 km from the coast, successfully appraised the Cabaça South East discovery.

1 . . . 759 760 761 762 763 764 765 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine