26 Ноября 2024 | вторник | 21:42
Energoterra

Новости

Smolensk NPP is preparing for the OSART mission

Сентября 15, 2010

Smolensk NPP held a meeting on preparation to the OSART mission – a large-scale international audit of operational safety, which is to be performed in September, 2011.

JSC FGC UES will provide for Nizhne-Bureskaya HPP power output and enhance reliability of power supply for customers in Amur region

Сентября 14, 2010

FGC UES, JSC RusHydro and Government of Amur region signed Cooperation Agreement. The Agreement defines interaction of the parties under realization of investment projects on Nizhne-Bureyskaya HPP and Nizhne-Zeyskaya HPP construction.

TVEL-designed component for fuel assembly receives U. S. patent

Сентября 14, 2010

United States Patent was assigned to OAO "TVEL" (Moscow) and OAO "Novosibirsky Zavod Khimkontsentratov" (Novosibirsk, Russia).

Mechel Reports Raising US $ 2bln Pre-Export Finance Facility to Refinance Its Existing Debt Obligations

Сентября 14, 2010

The new facility is split between the borrowers in mining (OJSHC Yakutugol and Southern Kuzbass Coal Company for US$857.1 mln each), steel (OAO Chelyabinsk metallurgical plant for US$95.3 mln) and ferroalloy (OAO South Urals Nickel Plant for US$190.5 mln) divisions of Mechel Group and is drawn in two tranches, a 3-year and a 5-year one.

A meeting on implementation of Rosatom production system was held at Smolensk NPP

Сентября 14, 2010

General Director of Rosenergoatom Concern OJSC Sergey Obozov held a meeting at Smolensk NPP concerning implementation at the enterprise of Rosatom production system when carrying out repairs at the NPP and managing production stock resources.

JSC FGC UES has completed testing of new-generation reactive power compensator

Сентября 14, 2010

JSC FGC UES has completed testing of new-generation of reactive power compensator of STATKOM type. The innovative equipment shall be installed at substation 330/400 kV Vyborgskaya (Leningradskaya area) until the end of 2010, this shall increase operation reliability of back-to-back station which connects power systems of Finland and Russia.

Turning Russian Nukes into U.S. Energy

Сентября 14, 2010

In 1993, shortly after the fall of the Soviet Union, the U.S. and the Russian Federation signed a landmark arms-control accord. The "Highly Enriched Uranium (HEU) Purchase Agreement" called for Russia to dismantle thousands of nuclear warheads and convert the weapons-grade uranium in the bombs into fuel for American nuclear-power plants.

LUKOIL makes advance payment of USD 500 million for a USD 1.2 billion loan

Сентября 13, 2010

OAO LUKOIL has made partial advance payment for a loan of USD 1.2 billion attracted in August 2009, with the maturity of 3 years.

Gazprom Management Committee approves adjusted draft Investment Program and Budget for 2010

Сентября 13, 2010

Pursuant to the adjusted draft Investment Program for 2010, the total amount of investments will make up RUB 905.23 billion, which is RUB 102.83 billion up as compared to the Investment Program approved in November 2009.

JSC FGC UES shall provide output of capacity from a new power generating unit of Ivanovo CCGTs

Сентября 13, 2010

A delegation from JSC FGC UES headed by the Chairman of Management board Oleg Budargin visited substation 220 kV Dagomys, substations 110 kV Laura and Roza Khutor in the Sochi region.

1 . . . 791 792 793 794 795 796 797 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine