25 Ноября 2024 | понедельник | 08:02
|
НовостиRepresentatives of Atomstroyexport will discuss in Minsk NPP construction cost considerationsИюня 10, 2010Representatives of the state authority NPP Construction Directorate and Atomstroyexport CJSC will discuss cost issues of the nuclear power plant construction in Belarus. Gazprom addresses competitive procurement of steel productsИюня 10, 2010The Board of Directors took notice of the information surrounding the participation of domestic manufacturers in pipes and steel products delivery for Gazprom and its subsidiary companies located in Russia and abroad. TNK-BP Supplied 40,900 Tons of Diesel Fuel to Agricultural Producers in the Saratov Region at Privileged Prices for the Spring Sowing CampaignИюня 10, 2010The agreement of cooperation between TNK-BP and the Saratov Region Government in 2010 implies supply of approximately 125,000 of fuels and lubricants to agricultural producers at privileged prices. Fuel is supplied from March to late November. Recession Drove 2009 Energy Consumption LowerИюня 09, 2010BP today launched its 2010 BP Statistical Review of World Energy, in which it announced that the global recession drove energy consumption lower in 2009 than the previous year, the first such decline since 1982, as the world economy contracted for the first time since the Second World War. TNK-BP to Use a New Pipeline Protection Method in the Orenburg RegionИюня 09, 2010The Oil and Gas Production Division (NGDU) Sorochinskneft of OJSC Orenburgneft (subsidiary of TNK-BP) is going to use a new method for protection of pipelines. In 2009 RUB 300 million was earmarked by Gazprom for the Tver Oblast gasificationИюня 09, 2010In 2010 the Company will invest RUB 226 million to accomplish construction of three inter-settlement gas pipelines with the total length of 52.4 kilometers. In its turn, the Oblast Administration will arrange consumer preparation to receive gas in 649 apartments and commission 3 gas fired boiler houses. “KazMunayGas” and Statoil ASA sign Memorandum of UnderstandingИюня 09, 2010The parties plan to conduct evaluation of the hydrocarbon upstream potential both on the territory of the Republic of Kazakhstan, and in other countries. The parties have determined the "Abai" area as a possible potential project for cooperation in Kazakhstan. Management Committee endorses Metrological Support Program for Gazprom’s operating activitiesИюня 09, 2010The Gazprom Management Committee endorsed the Comprehensive Goal-Oriented Program of Metrological Support for natural gas and liquid hydrocarbons extraction, transportation, processing, treatment, storage and supply processes for the period from 2011 through to 2015. “KazMunayGas” announces signing of an agreement on purchases of the bitumen plant facility turnkey construction worksИюня 09, 2010Road bitumens production in the Aktau Plastic Plant has been developed as part of the Petrochemical Industry Development Program for 2008-2013 in the Republic of Kazakhstan. TATNEFT Is Implementing a Program of Introducing Balancer-Free Drives for WellsИюня 09, 2010OAO TATNEFT is implementing a program of introducing long-stroke balancer-free chain drives (CD) in rod pumping units at the problematic well stock. They considerably reduce operating costs for oil production. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |