27 Ноября 2024 | среда | 23:52
|
НовостиThe first batch of canisters for ISF-2 has been delivered to ChNPPНоября 27, 2015The Double-Wall Canister (DWC) is the heart of the interim dry storage system NUHOMSÒ which will be implemented at the ISF-2 for the long-term interim storage of spent nuclear fuel (SNF) from Chernobyl NPP RMBK-1000 reactors. Turboatom continues work on equipment for Kakhovka HPPНоября 26, 2015At PJSC "Turboatom" continues work on manufacturing of equipment for Kakhovka HPP (station No 2). In November 2015 the enterprise's specialists have manufactured turbine shaft, hydroturbine runner is preparing for control assemblage and functional, oil testing. Gazprom’s import substitution efforts boost cutting-edge technologies in RussiaНоября 26, 2015The Gazprom Board of Directors took notice of the information about Gazprom Group's procurement activity in the new business environment as well as about the import restricting measures. Rosneft Awarded Labour Order of the Socialist Republic of VietnamНоября 26, 2015Rosneft Vietnam B.V., a company of Rosneft Group, received a governmental award of the Socialist Republic of Vietnam - Labour Order Second Class - for the contribution to the Vietnamese petroleum industry, and strengthening of the friendship and cooperation between Vietnam and Russia. Transneft Kama Region Finalizes Three Scheduled Repairs at Three Oil PipelinesНоября 26, 2015Transneft Kama Region, JSC carried out large-scale repairs in three trunk oil pipelines. 18 repairs ditches were dug to prepare for the work along trunk oil pipelines. Rosneft and EVRAZ signed agreement on natural gas supplyНоября 25, 2015Itera Oil and Gas Company, a Rosneft subsidiary, signed long-term contracts on natural gas supply with leading industrial companies of Sverdlovsk Region: Nizhny Tagil Metallurgical Plant and Kachkanarsky Ore Mining and Processing Plant, both EVRAZ Group companies. Naftogaz continues transmitting Russian gas to the EU; further purchases for Ukraine depend on demandНоября 25, 2015Naftogaz expects to receive all prepaid volumes of Russian gas today. DNV GL study calls for technology improvements to reduce costsНоября 25, 2015OG21 received the DNV GL study of technologies that should be developed for year-round oil and gas production at 74 degrees North in the Norwegian Barents Sea. New licenses are due to be awarded in this area as part of the Norwegian 23rd licensing round. PS-3 Up and RunningНоября 25, 2015PS-3, the first of those built as a per of the Expansion Project, was commissioned in Iki-Burulsky District of Kalmykia. Compressor units for "Sharkiy Berdakh" fieldНоября 25, 2015Sumy NPO has concluded the contract for manufacture of a number of products, as well as for appropriate supervision and commissioning work on the new booster compressor station (BCS), which is being constructed at the oil and gas field "Sharkiy Berdakh" in Uzbekistan. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |