27 Ноября 2024 | среда | 21:56
|
Новости“Turboatom” manufactured equipment for Slavyansk TPP (Ukraine)Декабря 08, 2015PJSC "Turboatom" continues work on equipment for Slavyansk TPP. In November 2015 enterprise's specialists manufactured High Pressure Cylinder (HPC) and Medium Pressure Cylinder (MPC) with rotors for unit №6b. Contract for hydraulic fracturingДекабря 08, 2015Till the end of the year the experts of Production Association Belorusneft will carry out 22 hydraulic fracturing operations on Krasnodar territory. NPP Director General: “Contract Amendment Will Positively Influence the Entire Decommissioning Process”Декабря 07, 2015Ignalina Nuclear Power Plant and consortium «NUKEM Technologies GmbH – GNS», the Contractor for one of the main decommissioning projects B1 (Interim Spent Fuel Storage Facility), signed the Contract Amendment for the Project. SUEK enterprises from Khakassia shipped over 10 mln tones of coal to its customersДекабря 07, 2015In the third decade of November, enterprises of Siberian Coal Energy Company in Khakassia, shipped to consumers 10 million tonnes of coal YTD. Kazancompressormash manufactures and supplies compressor systems for NOVATEKДекабря 07, 2015Kazancompressormash (HMS Group) has manufactured and supplied three centrifugal compressor systems for the project of booster compressor station by NOVATEK – Yurkharovneftegas. “Turboatom” is planning to participate in modernization of Armenian NPPДекабря 07, 2015The delegation of PJSC "Turboatom" headed by General Director Victor Subotin visited Armenia. The delegation also included General Designer Yevgen Levchenko and Chief Designer of Steam Turbines Victor Shvetsov. Chelyabinsk Oil Pipeline Department Completed Scheduled Maintenance of its Oil Trunk PipelinesДекабря 04, 2015Chelyabinsk Oil Pipeline Department of Transneft Urals, JSC has completed the scheduled work on the oil trunk pipelines as part of the Company’s 2015 technical upgrading and revamping program. Photovoltaic systems that adapt to the climate – subject of Austrian lead project researchДекабря 04, 2015The demand for photovoltaic (PV) systems has increased over the past few years. Global Small Wind Turbines Installed Capacity Will Surge to 4.8 Gigawatts by 2025Декабря 04, 2015Global cumulative installed capacity of small wind turbines will increase more than fivefold from 912.6 Megawatts in 2014 to 4.8 Gigawatts (GW) by 2025, at an impressive Compound Annual Growth Rate (CAGR) of 16.4%, according to research and consulting firm GlobalData. Gazprom and OMV discuss Nord Stream 2, asset swap and oil suppliesДекабря 03, 2015The Gazprom headquarters hosted a working meeting between Alexey Miller, Chairman of the Gazprom Management Committee and Rainer Seele, Chairman of the OMV Executive Board. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |