28 Ноября 2024 | четверг | 01:44
Energoterra

Новости

Turboatom finished work on order for h/u No 3 Dniester HPSPP

Ноября 18, 2015

PJSC “Turboatom” finished manufacture and shipment of hydroequipment for Dniester HPSPP No 3. In November 2015 enterprise shipped to plant Instrumentation devices. Order is completed.

OMV punctuates importance of Nord Stream II pipeline project

Ноября 18, 2015

Gerhard Schröder, the former German Chancellor, and the incumbent chairman of the shareholders committee of Nord Stream AG and Rainer Seele, the CEO of OMV, took part in “energy talks” on energy security in Europe which took place in Vienna attended by 350 European business and political dignitaries.

Reduced Solar Photovoltaic Additions in Germany and Japan Will Not Dampen Global Growth in 2015

Ноября 18, 2015

The global cumulative installed capacity for solar Photovoltaic (PV) power will rise from 175.4 Gigawatts (GW) in 2014 to an estimated 223.2 GW in 2015, despite the anticipated declines in the annual installations of several key countries, according to research and consulting firm GlobalData.

Perpetual youth for batteries? Neutrons explain aging process in lithium ion batteries

Ноября 17, 2015

A key issue with lithium ion batteries is aging. It significantly reduces their potential storage capacity.

Production of industrial gases in the refining sector in Kazakhstan is displayed on outsourcing

Ноября 17, 2015

Shareholders Agreement on creation of the Kazakh-French joint venture for the production of industrial gases was signed during the official visit of the President of Kazakhstan, NA Nazarbayev to France.

Rosatom is interested in supplies of fuel for research reactors in Latin America

Ноября 17, 2015

‘We can provide fuel even for a non-Russian design reactor,’ said Ivan Dybov, Rosatom’s Vice President in Brazil.

Rosneft and Saras noted the similarity of approaches on key issues of the enterprise’s development

Ноября 16, 2015

Rosneft Chairman of the Management board Igor Sechin made a working visit to the Sarroch refinery of Saras S.p.A., situated in Sardinia, Italy.

Successful startup of the Kaluga Turbine Works’ equipment was completed at the Northern TPP (Estonia)

Ноября 16, 2015

A 27 MW turbine manufactured by the Kaluga Turbine Works (KTW) (part of the Power Machines power engineering company) has been put into operation at the Northern TPP in Kohtla-Järve (Estonia) after 72-hour testing.

Transneft Volga Region Inspected Implementation of the Energy Saving Program

Ноября 16, 2015

The inspection group consisting of the experts from the subsidiaries of Transneft, JSC (Transneftenergo, LLC; Transneft R&D, LLC) visited the facilities of Transneft Volga Region, JSC, including oil pump stations.

Rosgeologia is about to finish exploration of copper potential block in the Volga Region

Ноября 14, 2015

JSC Votemiro Company (a subsidiary of Rosgeologia, the Orenburg Region) has finished the assessment of geological, geophysical and geochemical knowledge base of the Mednogorskaya area.

1 . . . 159 160 161 162 163 164 165 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine