01 Декабря 2024 | воскресенье | 03:19
|
НовостиConstruction of Amur GPP launchedОктября 16, 2015A festive ceremony dedicated to the start of the Amur gas processing plant construction took place in the Svobodnensky District of the Amur Region. Russian President Vladimir Putin commanded to launch the Amur GPP construction via a video call. Wärtsilä supplies 378 MW power plant to El SalvadorОктября 16, 2015Wärtsilä has been contracted to supply a major Flexicycle power plant to Energía del Pacífico S.A. in Acajutla, El Salvador. It will be the largest and most efficient power plant in El Salvador, and the first in Central America to be fired by LNG-based natural gas. DEA accelerates its growth strategy: acquisition of E.ON’s Norwegian assetsОктября 15, 2015DEA Deutsche Erdoel AG acquires 100% of the shares of E.ON’s Norwegian oil and gas business to create an enlarged Norwegian portfolio more than doubling its current production in Norway to 75,000 barrels of oil equivalent per day (boe/d). Nuclear and Renewables Will Drive India’s Cumulative Installed Capacity Beyond 600 GW by 2025Октября 15, 2015India’s cumulative installed capacity will more than double from 272.8 Gigawatts (GW) in 2014 to 609 GW by 2025, representing a Compound Annual Growth Rate (CAGR) of 7.3%, according to research and consulting firm GlobalData. Atomex Armenia Seminar for nuclear suppliers was held in ErevanОктября 15, 2015The Seminar was organized by Rosatom International Network jointly with the Ministry of Energy and Natural Resources of the Republic of Armenia. LUKOIL discovers large deep-water offshore gas field in RomaniaОктября 15, 2015LUKOIL announces the completion of drilling of the exploratory well Lira-1X and the discovery of a gas field in the Lira offshore structure, which is located at the Trident block (EX-30) in the deep-sea Romanian offshore. Rosneft Drills a Record-breaking Well in VenezuelaОктября 15, 2015Rosneft, as part of a PetroMiranda JV including PDVSA and Gazprom Neft, has drilled an unprecedented horizontal well GG1-14 at the Junin-6 block. Production Association Belorusneft tests wellhead equipment of in-house manufactureОктября 14, 2015The wellhead equipment was produced by Drilling equipment maintenance department– structural unit of Production Association Belorusneft. Transnefteproduct Samara Completed Scheduled Repairs at Oil Product Pipelines and Line Operation Dispatcher StationsОктября 14, 2015Transnefteproduct Samara, JSC completed a package of scheduled repair works at the line section of oil product pipelines and facilities of line operation dispatcher stations (LODS) in September – early October. KMG Nabors Drilling Company – a new prominent player at the drilling market in KazakhstanОктября 14, 2015Recent signing of the Service Order Assignment Agreement according to which the whole volume of drilling works performed at Tengiz field for “Tengizchevroil” will be transferred to the joint venture of “KMG Nabors Drilling Company”, has become a significant event for the whole oil and gas sector of Kazakhstan. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |