28 Ноября 2024 | четверг | 22:48
Energoterra

Новости

Rosgeologia to construct exploration and appraisal well in Pelyatkinsky gas condensate field

Июля 21, 2015

JSC "Rosgeologia" will act as a contractor in construction of exploration and appraisal well in Pelyatkinsky gas condensate field.

Sterling Energy’s Active On Five Rigs, Is the Busiest Company On Rig Sites In Nigeria

Июля 20, 2015

Sterling Energy, a relatively unsung Indian owned Independent, has the largest number of rigs in operation in Nigeria today.

New Gasfired Plant Adds 10% to Ivory Coast’s Electricity Capacity

Июля 20, 2015

Globeleq owned Azito Energie SA inaugurated the Phase 3 of its 430 MW combined-cycle gas turbine (‘CCGT’) Power Plant in Abidjan with an onsite inauguration ceremony held in the presence of His Excellency, President Alassane Ouattara, President of the Republic of Côte d’Ivoire.

Rosatom demonstrates its thermal capabilities at PowerGen

Июля 19, 2015

Within the framework of the world renowned POWER-GEN Africa conference and exhibition, Russian Atomic Energy Corporation Rosatom hosted a workshop on its thermal capabilities, ‘Modern Russian Technologies for Thermal Power Engineering in Africa.’

Enel Green Power adds new wind capacity to its operations in the US

Июля 19, 2015

Enel Green Power S.p.A., through its subsidiary Enel Green Power North America, Inc., has completed and connected to the grid the Osage Wind farm located in Osage County, Oklahoma.

LUKOIL dismisses clams by Prosecution Office of the city of Ploesti, Romania

Июля 18, 2015

PJSC LUKOIL has strongly denied accusations of money laundering and tax evasion brought against Petrotel-LUKOIL and its employees by the Prosecution Office under the Board of Appeal of the city of Ploesti, Romania.

Enel Green Power puts new wind farm online in Mexico

Июля 18, 2015

Enel Green Power has completed and connected to the grid the Dominica II wind farm in the Mexican state of San Luis Potosi. The new facility adds 100 MW to the capacity of the already online Dominica I, bringing the total installed capacity of the Dominica wind complex to 200 MW.

Enel Green Power and ENAP have begun construction the first geothermal plant in South America

Июля 17, 2015

Enel Green Power and Empresa Nacional del Petróleo (ENAP), the Chilean state-owned company active in the hydrocarbons sector, have begun construction in Chile on Cerro Pabellón, the first geothermal plant in South America.

First production Well Successfully Built at the East-Messoyakha Field

Июля 17, 2015

Rosneft and Gazprom Neft have completed early the project to build the first production well at the East-Messoyakha deposit, which is part of the Messoyakha cluster, the northernmost of the known Russian onshore oil fields.

Gibraltar Electricity Authority selects Elster to support drive to lower carbon emissions

Июля 16, 2015

The Gibraltar Electricity Authority (GEA) has selected Elster to provide smart grid capabilities across its upcoming pilot, which is set to be operational by the end of 2015.

1 . . . 188 189 190 191 192 193 194 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine