28 Ноября 2024 | четверг | 23:04
|
НовостиEnel Green Power has begins construction of new wind farm in MexicoИюля 16, 2015The power plant, which is owned by Vientos del Altiplano S. de R.L., a subsidiary of Enel Green Power Mexico S. de R.L. de C.V, will have a total installed capacity of 100 MW and will be built in the municipalities of Mazapil and Villa de Cos, in the state of Zacatecas. Transneft Urals let out sterlet juveniles into the river BelayaИюля 15, 2015Transneft Urals, JSC let out more than 200 thousand sterlet juveniles into the river Belaya in the Republic of Bashkortostan. West Africa: hungry for powerИюля 15, 2015The inaugural West Africa Power 2015 Summit, organised by global Summits organiser IRN, was held recently in Lagos, with the aim to discuss the challenges and possible solutions to improving the electricity generation and supply in the West African region, and how to attract more investment. "Turboatom" finished manufacturing of equipment for DniproHPP-2 (Ukraine)Июля 14, 2015PJSC “Turboatom” finished manufacturing of hydro-equipment for DniproHPP-2 (station No 17). Turbine manufactured in full scope and transferred for shipment. The first start at no load Was Performed at Berezovskaya GRES Power Unit No. 3Июля 14, 2015The first start of the new power unit №3 of Berezovskaya GRES was implemented on July 10 at 09:34 am (local Krasnoyarsk time). The turbine K-800-240 of the unit 3 has achieved the working rotating frequency (3000 rpm) at no load. SIBUR to ramp up MTBE production in TogliattiИюля 13, 2015SIBUR has started the preparatory stage of an investment project to ramp up the production of methyl tertiary butyl ether (MTBE), a high-octane petrol additive, at its production site in Togliatti. Transneft Urals Finished Planned Maintenance of the Tuimazy – Ufa Trunk PipelineИюля 13, 2015Transneft Urals, JSC has finished planned maintenance on the Tuimazy - Ufa trunk pipeline. Works at the Yazykovo - Ufa section of the Tuimazy - Ufa trunk pipeline were carried out near the Ufa pipeline metering station (PMS). Rimera's Pipeline Bends Commenced Production of Bends for the Yamal LNG ProjectИюля 12, 2015JSC Pipeline Bends, part of Rimera Group, will ship around 650 pipe bends for the South Tambey gas condensate field by the end of August 2015. Enel Russia has equipped two more power units at coal-fired Reftinskaya power plant with fabric filtersИюля 12, 2015Bag filters with an efficiency of 99.9% have been installed on power units №4 and №5. The new fabric filters, now installed at three out of ten units of the power plant, would allow to reduce ash emissions in the atmosphere for a total of up to about 40 000 tons per year. Winners in Electric Vehicle BatteriesИюля 11, 2015IDTechEx is the only market analyst tracking the development of 45 electric vehicle categories and not just electric cars. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |