29 Ноября 2024 | пятница | 11:46
|
НовостиConference exhibition Oil and Gas of UzbekistanИюня 08, 2015Gazprom International experts on the delegation of Gazprom have taken part in the proceedings of the 19th international exhibition and conference Oil and Gas of Uzbekistan, OGU – 2015, which was held in the city of Tashkent. New Minister of Energy Appointed in AlgeriaИюня 08, 2015Algeria’s Minister of Energy and Mining, Youcef Yousfi was dismissed by the country’s President, Abdelaziz Bouteflika. Ministry of Energy Has Recognized Rosseti's Projects NationalИюня 08, 2015Rosseti has introduced large-scale projects in the field of construction of "digital" electrical substations and overhead transmission lines, using new technologies of overhead lines construction based on supports of composite materials and insulating traverses. Estimated potential of the Azero area in in southern BoliviaИюня 08, 2015The potential for the hydrocarbon-bearing Azero area, the project that Gazprom International is participating in alongside the Bolivian division of the French oil and gas corporation Total, Total E&P Bolivie, is estimated at 5 trillion cubic feet (more than 140 million cubic metres) of natural gas. Sonatrach led by new directorИюня 08, 2015Algerian President Abdelaziz Bouteflika appointed Amine Mazouzi as chairman and CEO of the State Oil and Gas Corporation Sonatrach. Ukrtransgaz signs interconnection agreement with Hungarian gas transmission system operator FGSZИюня 07, 2015Ukraine’s gas transmission system operator (TSO) Ukrtransgaz and its Hungarian counterpart FGSZ have signed an interconnection agreement governing both directions of natural gas flows on the interconnector across the Ukraine-Hungary border. At Kurakhovo TPP commissioned turbine manufactured by “Turboatom”Июня 07, 2015With participation of specialists form PJSC “Turboatom” took place commissioning of turbine at Unit No 9 Kurakhovo TPP (Ukraine). Inter RAO Group Launches Ninth Power Generation Unit at Cherepetskaya TPPИюня 07, 2015Inter RAO Group launched a new 225 MW coal-fired power generation unit at Cherepetskaya thermal power plant (TPP) in Tula region, Central Russia. The new facility will be a part of the Capacity Delivery Agreement support program of the Government of Russia. Russia and China consider state of negotiations on gas supply via western routeИюня 05, 2015Beijing hosted meetings of Alexey Miller, Chairman of the Gazprom Management Committee with Zhang Gaoli, First Vice Premier of the State Council of the People’s Republic of China as well as with Wang Yilin, Chairman of the Board of Directors of China National Petroleum Corporation (CNPC). WELTEC Management System Wins Biogas Innovation AwardИюня 05, 2015On 3 June 2015, the biogas plant manufacturer WELTEC BIOPOWER received the „Biogas Innovation Award of the German Agriculture“ in recognition of its ProMOS Bio management system. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |