20 Января 2025 | понедельник | 16:50
|
НовостиTimur Lipatov appointed Chief Executive of LLC Inter RAO — Management of Electric Power PlantsЯнваря 01, 2015Timur Lipatov has been appointed the Chief Executive of LLC Inter RAO — Management of Electric Power Plants effective January 1, 2015. Wintershall halts oil production in LibyaЯнваря 01, 2015Wintershall again had to suspend onshore production in concessions C96 and C97 until further notice. With armed hostilities taking place at more and more oil export facilities, the Libyan National Oil Company (NOC) declared Force Majeure in mid-December. SIBUR and Air Products sign Agreement on building industrial gas production unit in PermДекабря 31, 2014SIBUR-Khimprom (a subsidiary of SIBUR Holding) and Air Products have entered into an agreement to build a new air separation unit in Perm and to supply the facility with locally produced gases. «Stroygazmontazh» has completed major construction and installation works within stage one of the construction project at Georgievsk compressor stationДекабря 31, 2014Stage one of the construction project at Georgievsk compressor station has been completed, the construction site now powered with electricity and fed with gas. Rosneft and Petrocas Create a Logistics and Retail Joint VentureДекабря 31, 2014Rosneft has entered into definitive documentation to acquire 49% stake in Petrocas Energy International Limited (“Petrocas”), creating the joint venture (“JV”) for its activities in the South Caucasus region. Gazprom purchasing 50 per cent of total shares in South Stream TransportДекабря 31, 2014Gazprom entered into agreements with Eni, Wintershall and EDF on purchasing 50 per cent of total shares in South Stream Transport from them. Upgraded Bubnovskaya CS to increase reliability of Southern CorridorДекабря 31, 2014The upgraded Bubnovskaya compressor station (CS) was commissioned today in the Volgograd Region. Russian-Chinese energy partnership gaining momentumДекабря 31, 2014The Gazprom headquarters hosted a working meeting between Alexey Miller, Chairman of the Company’s Management Committee and Li Hui, Chinese Ambassador to Russia. Power Machines manufactures equipment for Tianwan NPPДекабря 30, 2014Power Machines OJSC ha smanufactured and shipped electrical engineering equipment required for renovation of turbogenerator exciters at Tianwan NPP. Enel Green Power has completed two new photovoltaic plants in ChileДекабря 30, 2014Enel Green Power has completed two new photovoltaic plants in Chile, Lalackama and Chañares, that are now linked to the grid and the company has brought the final 4 MW of Diego de Almagro online. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |