20 Января 2025 | понедельник | 14:13
Energoterra

Новости

Bashkir Generation Company and Bashneft Sign Heat and Gas Supply Agreement

Января 12, 2015

Bashkir Generation Company LLC, a subsidiary of Inter RAO GROUP, and OAO ANK Bashneft signed an agreement for the supply of heat to oil refineries and petrochemical facilities, and the supply of associated gas to Bashkir power stations in 2015 and 2016, with a possible extension until 2022.

Radial drilling technology tested on a well in Barsukovskoye oilfield

Января 12, 2015

The first results have shown that the efficiency of the well was enhanced. Last year this unique Belarusian technology of hard-to-recover reserves stimulation and development was tested on a total of six wells of Belarusian deposits.

Fuel filling: delivery included

Января 12, 2015

First Belorusneft mobile filling station appeared in Grodno region. It delivers fuel to the car owners of Shchuchyn District communities.

Agreement between Alstom and the US Department of Justice

Января 12, 2015

Alstom has reached an agreement with the U.S. Department of Justice (DOJ) to resolve the investigation into alleged violations of the U.S.

EVRAZ North America agreed renewal of the asset-backed line in North America

Января 12, 2015

EVRAZ plc announces that its North American subsidiary, EVRAZ North America has closed the renewal and amendment of its asset-based revolving credit line (ABL).

TATNEFT: The crude oil production volume is expected to reach 26.2 million tons

Января 12, 2015

Nail Maganov, General Director of JSC TATNEFT, held a press conference for representatives of federal and republican mass media. General Director of the Company characterized the results and projects of the last year and announced the plans for 2015.

The Vyborgskaya CHPP of JSC TGC-1 celebrates its birthday

Января 12, 2015

The history of the power plant is inextricably linked to the development of Russian power plant engineering. The Vyborgskaya CHPP was built as a boiler facility at the Leningrad Metal Plant. It was to provide the plant with the required electricity and steam for testing steam turbines.

Turboatom finished manufacturing of equipment for Novosibirsk HPP

Января 11, 2015

OJSC “Turboatom” finished manufacturing of equipment for Novosibirsk HPP (station No5) in Russia. All equipment for this hydroturbine unit manufactured, accepted by Customer and transferred for shipment.

Gazprom secures gas supplies to southern Kyrgyzstan

Января 11, 2015

Natural gas supplies to the South of Kyrgyzstan were renewed today after an eight-month stoppage.

At Turboatom was manufactured second case of condenser for Balakovskaya NPP

Января 10, 2015

OJSC “Turboatom” manufactured and accepted for shipment 6 modules of the second case of condenser of turbine for unit No 2 Balakovskaya NPP (Russia).

1 . . . 266 267 268 269 270 271 272 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine