20 Января 2025 | понедельник | 15:06
|
НовостиTransneft is awarded by Rostekhnadzor with Certificate of Merit for achievements in industrial safetyЯнваря 04, 2015The Federal Service for Environmental, Technological and Nuclear Supervision (Rostekhnadzor) has awarded Transneft, JSC with a Certificate of Merit for achievements in industrial safety. TENEX concludes preliminary overview of 2014Января 04, 2015TENEX has successfully achieved the targets set by ROSATOM and demonstrated an upward trend in terms of business development in a challenging political and economic environment. Alstom’s Shareholders Meeting authorises the sale of the Energy businesses to General ElectricЯнваря 03, 2015This meeting gathered shareholders holding 64.25% of the total number of shares and voting rights. The resolution relating to this transaction was approved by a majority of 99.187%. The Expert Board of Transneft held Its Twelfth MeetingЯнваря 03, 2015Its members discussed the Company’s Long-Term Development Program until 2020. Response to the incident on the Tikhoretsk – Tuapse-2 trunk pipeline under constructionЯнваря 03, 2015On December 23, 2014 at 22.40 Moscow time, a pipeline leak with oil emulsion seepage took place during pipeline testing at the 242nd km of the Tikhoretsk – Tuapse-2 pipeline under construction in the vicinity of the Grechesky Township (Tuapse District). The total leakage is estimated at 8.4 m3. Anniversary of the welding of the first joint of the Kuyumba – Taishet pipelineЯнваря 03, 2015One year has passed since the official launch of the construction of the Kuyumba-Taishet oil trunk pipeline, which will link oil fields in the Krasnoyarsk Territory with the Eastern Siberia – Pacific Ocean (VSTO) pipeline system. The Port of Kozmino will Exceed the Plan of Oil Shipment in 2014Января 03, 2015The export of oil from the oil-loading terminal Kozmino is expected in 2014 to be at the level of 24.9 mln tons, which is significantly higher than the planned target. Yenisey Power Substation built by Stroytransgaz put in operation in KrasnoyarskЯнваря 03, 2015Federal Grid Company of Unified Energy System JSC put the 500 kV extra-high-voltage substation Yenisey in operation. The first autotransformer with a capacity of 801 MVA was put into operation. CPC loads the 40-millionth ton of oil since the beginning of the yearЯнваря 02, 2015On 31 December the CPC Marine Terminal has loaded the 40-millionth ton of oil since the beginning of this year. The tanker, SCF SURGUT, dwt 158,000 tons, took the jubilee ton of oil on board. It is bound for the port of Rotterdam. EVRAZ Makes First Greenhouse Gas Disclosure Within CDP FrameworkЯнваря 01, 2015CDP today is one of the few internationally recognized organizations that provide environment - and CSR-related metrics to investors. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |