03 Февраля 2025 | понедельник | 17:47
|
НовостиFrom 0 to 100 in ten minutesОктября 18, 2013Supply security is also a question of energy efficiency: Against this backdrop, today WINGAS and E.ON Energy Projects brought the new, highly efficient combined heat and power (CHP) plant in Lubmin on stream. Rosneft and CNPC Sign Memorandum to Expand Cooperation in Upstream Projects in East SiberiaОктября 18, 2013Development of Srednebotuobinsk field will serve as foundation for the future JV. On October 14, 2013 Rosneft consolidated 100% of Taas-Yuriakh Neftegazodobycha which holds the license to develop this field. Gazprom sets new record in potential sendout of UGS facilitiesОктября 18, 2013The Gazprom Management Committee examined the Unified Gas Supply System (UGSS) readiness for peak loads in autumn/winter 2013–2014 and addressed steps to be taken over the long term for securing continuous gas supply to consumers during the winter period. Bashneft wins the Astashevsko-Sosnovsko-Nazarovskiy subsoil area at an auction in the Republic of BashkortostanОктября 17, 2013Bashneft won the right to conduct geological exploration, prospecting and production of hydrocarbons at the Astashevsko-Sosnovsko-Nazarovskiy subsoil area. Bashneft will make a one-off payment for the area totalling 330 thousand roubles Igor Sechin Takes Part in 22nd World Energy CongressОктября 17, 2013On October 16, 2013, Igor Sechin, Rosneft President and Chairman of the Management Board, took part in the 22nd World Energy Congress in Daegu, South Korea. Turboatom has commissioned new machine toolsОктября 17, 2013In October 2013 OJSC "Turboatom" has commissioned three milling machines, NPC Haas VF- 3 (United States). The equipment was installed in the shop regulation, different parts shop and tool shop. Gazprom Neft’s Shakal block in Iraq sets seismic survey world recorder 2013Октября 16, 2013A new world seismic surveying record has been set on the Gazprom Neft operated Shakal block in Iraq. During the seismic study, data was transmitted from more than 6,200 sensors using RT System 2 wireless recording. NOVATEK completes construction of the second stage of Ust-Luga complexОктября 16, 2013NOVATEK announced today the completion of construction and the start of commissioning tests at the second stage of the Gas Condensate Fractionation and Transshipment Complex located at the port of Ust-Luga on the Baltic Sea. Russian President attends grand opening of one of the world’s largest polypropylene facilities in TobolskОктября 16, 2013Tobolsk-Polymer, one of the world’s largest polypropylene production facilities, was commissioned at a grand opening ceremony attended by the President of the Russian Federation Vladimir Putin. Turboatom has completed manufacture of equipment for Dobrotvorskaya TPPОктября 16, 2013OJSC "Turboatom" has completed manufacture of equipment for the unit No 8 of Dobrotvorskaya TPP (Ukraine). |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |