02 Февраля 2025 | воскресенье | 15:50
|
НовостиDCNS and Nass&Wind present the Winflo floating wind turbine in TokyoИюля 23, 2013From 24 to 26 July 2013, DCNS and Nass&Wind will present their Winflo floating wind turbine development programme at the 8th Renewable Energy 2013 exhibition in Tokyo, Japan. In January-Juny 2013 7.2 mln. tons of Crude Oil were processed at YANOSИюля 23, 2013In the I half-year period of 2013 7.2 mln tons of crude oil were processed at JSC "Slavneft-YANOS" which is 1% less in comparison with the similar index of the last year and is in compliance with the Refinery business plan. Technopromexport will Build Largest Power Plant on YamalИюля 22, 2013Company "Technopromexport" (TPE) has won a tender for implementation of the «Yamal LNG» Project for construction of a power plant for the liquefied natural gas (LNG) plant on the South Tambeysk gas field (the Yamal peninsula). The corresponding agreement is scheduled to be signed in the near future. Turboatom continues to work on manufacturing of the equipments for Starobeshevskaya TPPИюля 22, 2013In July, 2013 the specialists of JSC "Turboatom" manufactured and handed over under shipment knots of the modernization of the low pressure cylinder (LPC) for the block No. 12 of Starobeshevskaya TPP (Ukraine). The contract is about to complete. DTEK Starts Importing Gas from EuropeИюля 19, 2013DTEK plans to import up to 100 million cubic meters of natural gas in July. Throughout the year import volumes will be set based on economic expedience and conditions in the Ukrainian and European gas markets. Half-Year Results Were Summarized at "TANECO"Июля 18, 2013The employees' meeting on the results of the first half of 2013 was held at the "TANECO" Refinery and Petrochemical Plants Complex with participation of Nail Maganov, First Deputy General Director of JSC TATNEFT and Chairman of the Board of Directors of JSC "TANECO". TATNEFT Is Developing Dual Injection TechnologiesИюля 18, 2013JSC TATNEFT continues to actively apply innovative engineering developments to ensure the efficient oil fields operation. One of them is a dual injection method. The dual injection technology is today applied in operating 489 injection wells. Rosneft and Sakhalin Region Broaden CooperationИюля 18, 2013Rosneft President Igor Sechin and Sakhalin region’s Governor Alexander Khoroshavin signed a Supplement to the Cooperation Agreement. The parties agreed to discuss the construction of an LNG facility and all required gas pipeline infrastructure in the region. Moscow refinery switches to Euro-5 fuel productionИюля 17, 2013A catalytic cracking and hydrotreating unit and light naphtha isomerisation unit have been put into operation at Gazprom Neft’s Moscow refinery. Sergei Sobyanin, Moscow’s acting mayor, has visited the new facilities. Chain of TATNEFT's Filling Stations. Half Year ResultsИюля 16, 2013As of the end of the first half of 2013 there were 630 filling stations belonging to TATNEFT Group of companies with 508 facilities located in the territory of the Russian Federation, 114 in the territory of Ukraine and 8 filling stations located in the Republic of Belarus. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |