30 Ноября 2024 | суббота | 08:36
|
НовостиRosneft fully replaced its oil reserves in 2010Февраля 18, 2011Rosneft announced the results of the annual independent audit of its hydrocarbon reserves performed by DeGolyer & MacNaughton. In 2010 the oil reserve replacement ratio was 106%. Rosneft had hydrocarbon reserve life of 25 years, including 21 years - for oil and 67 years - for gas. Testing Range for Energy Saving Technologies Established in TATNEFTФевраля 17, 2011TATNEFT has developed a model integrated energy efficient solution for the system of crude oil production, gathering and treatment on the basis of energy saving technologies. Its approbation is on the way now on the basis of Yamashneft Oil and Gas Production Board (NGDU) of OAO TATNEFT as part of the development and operation of Arkhangelskoye deposit (Novosheshminsky Region of the Republic of Tatarstan). BP Confirms Plans For Further Petrochemicals Growth in China Including Debottlenecking of BP ZhuhaiФевраля 17, 201117 February 2011: BP today confirmed that it is proceeding with its project for a major increase in purified terephthalic acid (PTA) production capacity at the BP Zhuhai Chemical Company Limited (BP Zhuhai) site in Guangdong Province, China, a JV between BP and Zhuhai Port Co., Ltd. (formerly named Fu Hua Group) and also announced that it is planning to build a new world-scale PTA plant at the same site. TNK-BP: FY 2010 investor conference call and webcastФевраля 17, 2011TNK-BP International Ltd. will host a global investor conference call and webcast to present its FY 2010 operational and financial results on Tuesday 1 March, at 17:00 MSC / 14:00 LDN / 09:00 NY. Volgogradneftemash JSC is shipping large size equipment for Kuybyshev Oil RefineryФевраля 17, 2011Shipment of Continuous Catalytic Cracking Unit for Kuybyshev Oil Refinery (NK “Rosneft”) has started at the berth of Volgogradneftemash including the main column with diameter 4,5m and height 51m as well as Reactor and Regenerator with weight 130t and 235t, diameter 5,6m and 7,6m accordingly. Public hearings were held on Shtokman Project, Phase IФевраля 17, 2011On February 15, 2011, in Teriberka, materials of design engineering documentation on onshore start up facility of the Shtokman Project, Phase I, were discussed, including section “List of Environmental Measures Including Environment Impact Assessment (EIA)”. Statoil Canada Ltd. charged with Water Act InfractionsФевраля 17, 2011Statoil Canada Ltd. received a legal summons from Alberta Environment for allegedly contravening parts of its water license and providing false and misleading information regarding water withdrawals for drilling activities. Gazprom acquires a stake in Libya’s Elephant oil project from EniФевраля 17, 2011In the presence of Russian President Dmitry Medvedev and Italian Prime Minister Silvio Berlusconi a Farm-out Agreement for the Elephant project Production Sharing Agreement (PSA) has been signed in Rome between Alexey Miller, Chairman of the Gazprom Management Committee and Paolo Scaroni, Chief Executive Officer of Eni. New inspection vessel for NCSФевраля 16, 2011A frame contract for inspection, maintenance and repairs of subsea installations and pipelines has been awarded by Statoil to Subsea 7. The estimated value of the contract is approximately NOK 2 billion, including options. RUSNANO supports the Smart House projectФевраля 16, 2011First Smart House in Russia complying with the ecological BREEAM standard at the "Excellent" level will be constructed in the Chuvash Republic. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |