30 Ноября 2024 | суббота | 00:50
|
НовостиA meeting on the project of molybdenum-99 creation has been held at JSC “SSC RIAR”Февраля 09, 2011At JSC “SSC RIAR” there was a meeting on 2010 results of work of Rosatom’s enterprises, participants of the project concerning establishment of a complex for molybdenum-99 production at JSC “SSC RIAR”. "Elara-DV" tanker - the new approach to logistics in bunkering businessФевраля 09, 2011"Elara-DV" tanker has started to work as a port fueler. Two foreign vessels were supplied with fuel within one day. At anchorage of port of Nakhodka it filled in more than 600 tn of IFO-380 fuel in tanks of the Chinese bulker "Qing ping hai" within two hours. OMZ-Spetsstal will manufacture a hydro turbine shaft for the Zhigulevskaya power plantФевраля 09, 2011OMZ-Spetsstal, a part of OMZ Group, will manufacture a hydro turbine workpiece shaft for the Zhigulevskaya power plant, ordered by OAO Power Machines. Manufactured from a 190 ton slab in cooperation with OAO Izhorskiye Zavody, the workpiece shaft will be 6 m long and 1.5 m in diameter. It will be delivered in June or July 2011. ConocoPhillips completed the sale of its remaining holding in LUKOIL by selling it in the open marketФевраля 08, 2011Thus, since September 26, 2010 ConocoPhillips has sold over 6% of LUKOIL shares in the open market. ConocoPhillips resolved to sell its stake in LUKOIL at the end of 2008 aiming to raise funds for repaying its own debt and buying back its own shares. Slavneft and the Government of the Yaroslavl region signed the Cooperation Agreement for 2011Февраля 08, 2011Yuri Sukhanov, President of ОАО NGK Slavneft and Sergey Vakhrukov, Governor of the Yaroslavl region, signed the Additional Cooperation Agreement which determines the key areas and parameters of interaction aimed at development of the region social sphere in 2011. Tranzit-DV Group has launched a new delivery program of oil products to Russian Far EastФевраля 08, 2011Tranzit-DV Group has started the delivery of wide range of oil products to the RFE market. All products are in a strict accordance with international ecological standards. This project is implemented as the partnership program with TNK-BP. TNK-BP Boosts Oil Output at UvatФевраля 08, 2011In January 2011, oil production under the Uvat projected reached 428,000 tonnes, which was 24.6% up on January last year. Seabed Works Ensure Safety of Nord Stream PipelineФевраля 08, 2011Today, the world’s biggest submarine pipeline plough, PL3, arrived in the Baltic Sea on the deck of mother ship Far Samson. The subsea plough will be used to entrench the Nord Stream Pipeline in Swedish and Danish waters. Lowering of the pipeline below seabed level using PL3 ensures that the pipeline will remain stable in its position throughout its lifetime. Izhorskiye Zavody win a tender for the production of petrochemical equipment for OAO TAIF-NK oil refineryФевраля 08, 2011Izhorskiye Zavody, a part of OMZ Group, has won an international tender for the production of petrochemical equipment for OAO TAIF-NK oil refinery (Tatarstan Republic, Nizhnekamsk). According to the contract Izhorskiye Zavody is to manufacture the DS-302 hydro treater unit, with weight of 212 tons, 4.8 m diameter and approximately 15 m length. Follow-up meeting on Gullfaks with PSAФевраля 08, 2011Statoil had a meeting with the Petroleum Safety Authority Norway (PSA). The main themes were the status of the well and the reservoir conditions, and updated plans for relief wells at the Gullfaks field. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |