30 Ноября 2024 | суббота | 00:41
Energoterra

Новости

VCNG ensured 120 percent growth in oil production

Февраля 08, 2011

OJSC VCNG closed the year of 2010 with a considerable growth in operations. The total volume of produced hydrocarbons exceeded the analogous parameter of 2009 by 120 percent and amounted to over 2 mln 600 thousand tonnes. Operations were boosted in all spheres of activities.

Microsoft and DTEK discussed deepening of the cooperation

Февраля 08, 2011

President of Microsoft International Jean-Philippe Courtois and CEO of DTEK Maxim Timchenko discussed the prospects of increased cooperation between the companies during a bilateral meeting at the World Economic Forum in Davos.

Saratov Oil Refinery Started Production of Euro-4 Gasoline AI-95

Февраля 08, 2011

OJSC Saratov Oil Refinery (subsidiary of TNK-BP) started production of AI-95 gasoline compliant with the Euro-4 standard, which extends the service life and improves the operation characteristics and efficiency of engines.

Mechel Signs US$210 mln Loan To Finance Construction of Second Line at Sibirginskaya Mine

Февраля 08, 2011

Mechel OAO (NYSE: MTL) announces it has signed a loan agreement to finance construction of the second line at the Sibirginskaya mine (owned by Mechel Mining OAO’s subsidiary Southern Kuzbass Coal Company OAO).

DTEK announces it resumes electricity export to Belarus

Февраля 07, 2011

DTEK, Ukraine’s leading fuel and energy company, announces it resumes electricity export to Belarus. Andrey Favorov, Director of Power Trade, trading arm of DTEK, said that estimated power of supply will be around 300-400 MW.

At OJSC "Turboatom" started certification of workplaces

Февраля 07, 2011

In 2011 at OJSC "Turboatom" are certified the working conditions at workplaces. These activities are carried out once every 5 years. In accordance with the plant's order is established Certification Commission, whose Chairman was appointed Chief Engineer Gregory Ishchenko.

JSC “Atomstroyexport” has carried out hydraulic testing of the second circuit equipment of Kudankulam NPP at pressure of 100 kg/sm2

Февраля 07, 2011

With technical support of JSC “Atomstroyexport” (JSC ASE), subsidiary of Rosatom State Corporation, hydraulic testing of the second circuit equipment of the first power unit of Kudankulam NPP (India) at pressure of 100 kg/sm2 was successfully completed. The pressure build-up was implemented according to NPP precommissioning program. All systems of the Unit worked in operation mode.

South Stream chief seeks EU level playing field

Февраля 07, 2011

The European Union should create a level playing field among the various projects to bring gas to the continent along new routes, the head of the Russian-backed South Stream pipeline has urged. Marcel Kramer also forcefully rejected critics’ claims that one of South Streams’s primary purposes was to frustrate Nabucco, a rival gas project backed by €200m in EU funding that hopes to transport gas from the Caspian basin to Europe.

BP Joins Marine Well Containment Company

Февраля 07, 2011

BP announced that it has joined Chevron, ConocoPhillips ExxonMobil and Shell as a member of the Marine Well Containment Company LLC (MWCC). BP brings its marine response experience and equipment to the MWCC.

NOVATEK and Atomflot sign Cooperation Agreement

Февраля 07, 2011

OAO NOVATEK First Deputy Chairman of the Management Board, Mikhail Popov, and the General Director of the Russian Federation’s Atomflot (Atomflot), Vladimir Ruksha, signed a Сooperation Agreement (Agreement) establishing the framework for the development of reliable and safe transportation solutions for the Yamal peninusla and Northern Sea Route.

1 . . . 691 692 693 694 695 696 697 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine