29 Ноября 2024 | пятница | 20:46
|
НовостиTGC-1 releases 2010 operational resultsФевраля 01, 2011Electricity generation (including subsidiary – Murmanskaya CHPP) for the full year amounted to 27,162 GWh (thermal generation – 14,239 GWh, hydro generation – 12,923 GWh) which is 1,5% higher than in 2009 (26,761 GWh: thermal generation – 12,801 GWh, hydro generation – 13,960 GWh). SIBUR and TNK-BP Expand Their APG Processing Joint VentureФевраля 01, 2011SIBUR and TNK-BP have agreed to expand their joint venture, Yugragazpererabotka LLC, by merging Nyagangazpererabotka LLC, a gas processing entity, held until this time by the petrochemical holding, with and into the JV. Gazpromneft-Nefteservis Completes Sale of Muravlenko Transport CompanyФевраля 01, 2011Gazpromneft-Nefteservis has completed the sale of Muravlenko Transport Company (Muravlenkovskaya Transportnaya Kompaniya) (MTK) previously incorporated into the company's transport block of three business units. MTK was bought by Nizhnevartovsk Utility Vehicles Department No. 1. The deal was passed by the Federal Antimonopoly Service of the Russian Federation. LUKOIL is offered to acquire 11% in the joint venture to operate ISABФевраля 01, 2011LUKOIL received a notice that the Board of Directors of the Italian ERG resolved to sell to LUKOIL 11% in the joint venture to operate the ISAB refining complex located in Priolo (Sicily). Gazprom Neft Makes Mandatory Share Purchase Offer to NIS Minority ShareholdersЯнваря 31, 2011Gazprom Neft has today submitted an offer to buy out the free float shares in NIS, the Serbian oil company. The offer period will expire in 45 days. A maximum of 31,180,000 shares with voting rights (19.12 per cent of the equity) currently held by Serbian citizens, may become available for purchase. Preliminary feasibility study to switch Cherepetskaya GRES to off-design fuelЯнваря 31, 2011COTES together with the Machine Building Factory of Podolsk has developed a preliminary feasibility study for refurbishment of boiler for power unit No. 7 of the Cherepetskaya GRES. Refurbishment will also cover fuel supply line and pulverized coal preparation system to switch the power unit to burning of off-design Kuznetsky long-flame gas coal. Sakhalin-1 Project Drills World’s Longest Extended-Reach Well. Sets record at 40,502 feet (7.67 miles)Января 31, 2011Exxon Mobil Corporation (NYSE:XOM) announced that its subsidiary, Exxon Neftegas Limited, has successfully drilled the world’s longest extended-reach well at the Odoptu field, offshore far east Russia. “Spetsgazremstroy” has supplied gas to AltaiЯнваря 31, 2011OJSC “Spetsgazremstroy”, entering the SGM Group of companies has completed construction of the second construction stage of inter village gas pipelines in the Republic of Altai. The construction investor is – LLC “Gazprom mezhregiongaz”, the employer – is OJSC “Regiongazholding”. Rosneft deals BP double blowЯнваря 31, 2011Russian partners in TNK-BP venture start legal moves over Rosneft tie-up, as Rosneft announces deal with BP's US rival ExxonMobil. Chevron Reports Fourth Quarter Net Income of $5.3 Billion, Up From $3.1 Billion in Fourth Quarter 2009Января 31, 2011Chevron Corporation (NYSE: CVX) reported earnings of $5.3 billion ($2.64 per share – diluted) for the fourth quarter 2010, compared with $3.1 billion ($1.53 per share – diluted) in the 2009 fourth quarter. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |