23 Ноября 2024 | суббота | 08:23
Energoterra

Новости

Discussion of “Karelia Energy Bridge” Russian and Finnish Project at “Karelenergo”

Марта 04, 2010

This summer, a decision on making the application for technical connection to “Karelenergo” electric grids is to be adopted due to results of specified estimation of possibility to create “Karelia Energy Bridge”.

IES-holding “Generation of Urals” Division has summed up the results of activity on civil defence, emergency situations prevention and response in 2009

Марта 04, 2010

Much attention was given to increase of emergency situations prevention system efficiency on power industry sites. All planned events and arrangements are fully completed.

“Naftogaz of Ukraine” has opened the third hydrocarbon field in Egypt

Марта 04, 2010

National joint – stock company Naftogaz of Ukraine continues successful realization of the project regarding the development of concession site of Alam El Shawish within the Western Desert in the Arab Republic of Egypt.

Gazprom and the Astrakhan Oblast give priority to the following areas of cooperation

Марта 03, 2010

Astrakhan hosted today a working meeting between Alexander Ananenkov, Deputy Chairman of the Gazprom Management Committee and Alexander Zhilkin, Governor of the Astrakhan Oblast.

IDGC of North-West, JSC Exercised 6,431 Agreement for Technical Connection for 214.31 MTW Total Capacity in 2009

Марта 03, 2010

In 2009, 13,233 applications for technological connection for total capacity of 842.63 MWT have been made at IDGC of North-West, JSC. In comparison with the year 2008, number of applications increased by 19.96% while requested capacity reduced by 36.35%.

Gazprom’s experts take business trip to Astrakhan Oblast

Марта 03, 2010

Led by Alexander Ananenkov, Deputy Chairman of the Gazprom Management Committee the Company’s experts took a business trip to the Astrakhan Oblast.

ACCR Composite Electric Conductor to be Established for the First Time at Energy Object Built at “Vologdaenergo”

Марта 03, 2010

An ACCR-type empowered aluminum composite electric conductor, a production of modern technologic developments, is planned to be used under building of 110 kV distribution point at the territory of Vologodskaya CHP at “Vologdaenergo”, a branch of IDGC of North-West, JSC.

Siemens to supply power plant components to Turkey

Марта 03, 2010

Siemens Energy has secured an order to supply key components for the Denizli combined cycle power plant in Turkey.

Evraz Wins Licence to Develop Mezhegey Coal Deposit

Марта 03, 2010

Evraz Group announced that it has won the tender to develop the Mezhegey coal deposit in the Republic of Tyva, Russia. Evraz offered RUB950 million (approximately US$32 million) in the tender held by the Russian State Mineral Resources Agency.

Gazprom, GDF SUEZ and Total are sponsors of Holy Russia exhibition in Louvre

Марта 02, 2010

The exhibition of Russian art ‘Holy Russia’ started today in the Louvre in the presence of President of Russia Dmitry Medvedev and President of France Nicolas Sarkozy. Gazprom, GDF SUEZ and Total became primary sponsors of this cultural event, celebrating the Year of Russia in France.

1 . . . 899 900 901 902 903 904 905 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine