23 Декабря 2024 | понедельник | 21:41
|
НовостиCPC Marine Terminal Loaded 2000th TankerМарта 06, 2010Caspian Pipeline Consortium (CPC) finished loading the 2000th crude oil tanker at its Marine Terminal near Novorossiysk today since commissioning. “Institute Hydroproject” took part in IV All-Russian meeting of hydro power engineersМарта 06, 2010IV All-Russian meeting of hydro power engineers is taking place in Moscow, “Electrification” pavilion of All-Russian Exhibition Center. Kaluga Turbine Works fulfill order for metallurgic companyМарта 06, 2010Kaluga Turbine Works (KTZ), a branch of Power Machines, manufactured the first 50 MW steam turbine for Novolipetsk Steel (NLMK). Gazprom and Perm Krai sign Agreement of CooperationМарта 06, 2010Аt the Gazprom headquarters Alexey Miller, Chairman of the Company’s Management Committee and Oleg Chirkunov, Governor of the Perm Krai signed an Agreement of Cooperation between Gazprom and the Perm Krai for an indefinite period. Balakovo NPP: more than 2.1 bln. kWh of electric power is generated in FebruaryМарта 06, 2010In February of 2010 Balakovo NPP in accordance with operations schedule generated more than 2.132 bln. kWh of electric power. Installed capacity utilization factor (ICUF) made 79.34%. The best ICUF value is achieved at power units No. 2 and 3 – 106.9%. Between 2007 and 2009 Gazprom earmarked in excess of RUB 450 million for the gasification of KareliaМарта 05, 2010The Gazprom headquarters hosted today a working meeting between Alexey Miller, Chairman of the Gazprom Management Committee and Sergey Katanandov, Head of the Republic of Karelia. Beloyar NPP: plan for February is fulfilled for 104%Марта 05, 2010In February of 2010 power unit of Beloyar NPP BN-600 functioned at nominal level of output and generated 401.64 mln. kWh of electric power. The monthly plan for generation is fulfilled for 104.3%. Installed capacity utilization factor in February made 99.61%. Gazprom would continue investing in gasification of the Republic of AltaiМарта 05, 2010The average gas penetration level in the region is below 1 per cent. The same rate throughout Russia averages 63.2 per cent. Between 2007 and 2009 Gazprom allocated RUB 1.1 billion for the regional gasification. "Belkamneft" started 3D seismic works at Pionerskoye oilfieldМарта 05, 2010"Belkamneft", a subsidiary of OAO NK "RussNeft" started 3D seismic works at Pionerskoye oilfield. The research is being conducted in conformity with license obligations for geological study of subsoil. Cooperation Agreement Signed between Gazprom Neft and Administration of Nadymskiy District of YaNAOМарта 04, 2010Cooperation Agreement 2010 was signed between Gazprom Neft and the Administration of Nadymskiy District of YaNAO. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |