25 Ноября 2024 | понедельник | 21:39
Energoterra

Новости

Enel invested approximately 380 million US dollars in the construction of the new wind facility in Brazil

Февраля 06, 2018

Enel, through its Brazilian renewable subsidiary Enel Green Power Brasil Participações (EGPB), began operation of its Morro do Chapéu Sul wind facility, which has a total installed capacity of 172 MW and is located in the municipalities of Morro do Chapéu and Cafarnaum, in Brazil’s north-eastern state of Bahia.

Acid-proppant fracturing used by Gazprom Neft for the first time at the Eastern Block of Orenburgskoye field

Февраля 06, 2018

Multi-stage acid-proppant fracturing* has been used for the first time by Gazprom Neft, at well No. 1522 in the Eastern block of its Orenburgskoye oil and gas-condensate field.

Earnings Release and Financial Results Q1 FY 2018: Strong order growth highlights successful first quarter

Февраля 04, 2018

Orders rose 14% to €22.5 billion and revenue was up 3% at €19.8 €billion, including strong growth contributions from Mobility and Digital Factory and new business particularly resulting from the merger of Siemens' wind power business with Gamesa Corporación Tecnológica, S.A.

Moody’s rates Inter RAO Group

Февраля 02, 2018

After an unscheduled review of credit ratings, Moody’s Investors Service has increased Inter RAO Group's international credit rating from Ba1/stable up to Baa3/stable on the global scale.

Nord Stream 2 Receives Permit for German Territorial Waters

Февраля 01, 2018

Nord Stream 2 AG received the construction and operation permit for the planned pipeline in German territorial waters and the landfall area in Lubmin, near Greifswald.

Enel sells solar energy from new 27 MW plant in USA to Wynn Las Vegas Resort

Января 30, 2018

Enel Green Power North America, Inc. (“EGPNA”), the US renewable energy company of the Enel Group, has signed a Power Purchase Agreement (PPA) with Wynn Las Vegas whereby the resort, located on the world-famous Las Vegas Strip, will buy the energy produced by EGPNA’s new 27 MW1 Wynn Solar Facility at Stillwater.

Vladimir Putin Launched the Work of Two Installations at TANECO

Января 26, 2018

On January 25, Vladimir Putin, President of the Russian Federation, and Rustam Minnikhanov, President of the Republic of Tatarstan, participated in a video conference format in the ceremony of putting into operation the naphtha hydrotreatment and isomerization installations at the TATNEFT’s TANECO Oil Refining Complex in Nizhnekamsk.

The Chile’s village of Toconce inaugurated a rural electrification programme

Января 25, 2018

Located about 90 kilometres from Calama at an elevation of over 3,300 metres above sea level, the village, of pre-Hispanic origin, has access to continuous electric power for the first time.

Enel starts construction of 93 MW wind farm in Mexico

Января 23, 2018

Enel S.p.A., acting through its renewable energy subsidiary Enel Green Power México (EGPM), has started the construction of the 93 MW Salitrillos wind farm, the company’s first plant in the north-eastern Mexican state of Tamaulipas.

DTEK, GE sign turbine agreement for Primorsk wind farm, to be among the most innovative and powerful in the Ukraine

Января 18, 2018

DTEK and GE Renewable Energy have signed a contract for the procurement, installation and subsequent maintenance of 26 wind turbines.

1 . . . 91 92 93 94 95 96 97 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine