25 Ноября 2024 | понедельник | 23:50
|
НовостиYamal LNG shipped first LNG cargoДекабря 12, 2017NOVATEK announced today that Yamal LNG has shipped the first LNG cargo containing 170 thousand cubic meters. The first cargo was sold to Petronas LNG UK Limited (PLUK). Bashneft and Rosneft sue Sistema for damagesДекабря 11, 2017Bashneft and Rosneft, acting for the benefit of Bashneft as its shareholder, filed a lawsuit in Bashkortostan arbitration court seeking 131,639,012,421 rubles in damages from Sistema and Sistema-Invest. Enel signs 85 MW of capacity storage agreements in us with pacific gas and electricДекабря 08, 2017Enel S.p.A. (“Enel”), through its US renewables company Enel Green Power North America, Inc. (“EGPNA”), signed three Capacity Storage Agreements (“CSA”) with California utility Pacific Gas and Electric (“PG&E”) for a total capacity of 85 MW/340 MWh. New monthly loading record at the Marine TerminalДекабря 06, 2017Based on November 2017 results 5,001,341 gross tons (39,621,126 barrels) of crude oil were loaded from the Caspian Pipeline Consortium Marine Terminal. This is an all-time record for monthly loadings over the entire period of CPC operations. Enel sells 80% stake in two wind farmsДекабря 05, 2017Enel signed an agreement with investment fund Gulf Pacific Power for the sale to the latter of an 80% stake in the 200 MW Caney River wind farm and 150 MW Rocky Ridge wind farm for a total consideration of about 233 million US dollars. Closing of the transaction is expected by end-2017 NOVATEK signed MOU with Total and Siemens on cooperation in VietnamДекабря 04, 2017NOVATEK announced today that its subsidiary NOVATEK Gas and Power Asia Pte Ltd signed a Memorandum of Understanding (MOU) with Total Gas & Power Business Services S.A.S and Siemens Aktiengesellschaft. Enel Russia strategic plan 2018-202 renewing growthНоября 30, 2017Successful delivery on company’s strategic pillars helped to improve 2017 financial forecast and bottom-line targets for upcoming years. Mayakovskaya TPP in the Kaliningrad region began the "hot calibration"Ноября 29, 2017As part of the project for the construction of new generating capacity in the Kaliningrad region, the first ignition of a gas turbine (GTP) of the first power island of Mayakovskaya TPP was held. NOVATEK Signed MOU with Marubeni and MOLНоября 28, 2017NOVATEK today signed a trilateral Memorandum of Understanding (MOU) with Marubeni Corporation and Mitsui O.S.K. Lines, Ltd. (MOL). The world's longest well was drilled in SakhalinНоября 28, 2017Rosneft as a member of Sakhalin-1 Consortium successfully completed drilling of the world's longest well from Orlan platform at Chaivo field in the Sea of Okhotsk. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |