20 Августа 2017 | воскресенье | 10:54
Energoterra

Аналитика

DNV GL invites wind industry to Joint Industry Project to optimize wind farm operations

Июня 15, 2017

Hamburg, Germany – 15 June 2017, DNV GL announces its latest Joint Industry Project (JIP), aiming to optimize the performance of wind farms by reducing the downtime and lower the costs of energy during the operational project life span of 25 years or more.

The two-millionth ton of oil accepted into the CPC system from Russian fields on the Caspian Sea shelf

Июня 08, 2017

On June 8, 2017, the two-millionth ton of oil was accepted from Lukoil at the Komsomolsk pump station of Caspian Pipeline Consortium (CPC) in the Republic of Kalmykia into the CPC system. Since the beginning of 2017, Lukoil has delivered about 1.3 million tons of oil into the CPC system.

INNOVATION A KEY FACTOR FOR DEVELOPMENT IN AFRICA

Мая 24, 2017

The Association’s annual conference is dedicated entirely to Mediterranean and sub-Saharan Africa this year. There is a need for innovative business models to create growth opportunities.

ENEL TO INVEST FURTHER IN SPANISH RENEWABLE SECTOR WITH 540 MW OF WIND CAPACITY AWARDED

Мая 19, 2017

Enel S.p.A. (“Enel”), acting through its Spanish subsidiary Endesa’s renewable company Enel Green Power España (“EGPE”), has been awarded 540 MW of wind power capacity in Spain.

ENEL’S NET ORDINARY INCOME UP 18.6% IN 1Q 2017 DUE TO LOWER FINANCIAL EXPENSES AND REDUCED IMPACT FROM MINORITIES

Мая 15, 2017

Revenues: 19,366 million euros (17,872 million euros in the first quarter of 2016, +8.4%)  Due to an increase in revenues from sales to end users and electricity transport, an increase in electricity trading activities, as well as the depreciation of the euro against most of the currencies of the countries in which the Group operates  EBITDA: 3,914 million euros (4,017 million euros in the first quarter of 2016, -2.6%)

Wärtsilä invests in strengthening its turbocharger services

Мая 11, 2017

The technology group Wärtsilä invests in expanding its offering and global service workshop footprint in turbocharger services. Over 20 Wärtsilä service workshops globally are equipped with full capability to service turbochargers. With this investment, Wärtsilä is able to offer customers global turbocharger services coupled with engine knowhow in flexible cooperation with other Wärtsilä service centres. Customers can reduce their operational risk and save time by being able to overhaul the turbocharger at the same time as the engine.

Lower Saxony Foreign Trade Award 2017: WELTEC BIOPOWER among the Top Five Innovative Drive Praised by Olaf Lies

Мая 05, 2017

Olaf Lies, Minister of the Economy „The ‚Made in Germany’ label is a special cachet and thus an export driver.“ With these words, Lower Saxony‘s Minister of the Economy Olaf Lies conferred the Lower Saxony Foreign Trade Award.

ENEL RUSSIA POSTED SOLID 1Q 2017 RESULTS THANKS TO INCREASED CAPACITY PAYMENTS

Апреля 27, 2017

Carlo Palasciano Villamagna, General Director of Enel Russia, said: “We are pleased to present Enel Russia strong first quarter results, mainly resulting from the increase in capacity payments, as well as improved operating results of main generation facilities.

LUKOIL LUBRICANTS EAST EUROPE CELEBRATES 10TH ANNIVERSARY

Апреля 21, 2017

“Starting as a local supplier, LUKOIL now participates in global projects of lubricants supplies to large automotive producers. As a result, our European subsidiaries, including LUKOIL Lubricants East Europe, are playing an increasingly important role” said Maxim Donde, General Director of LUKOIL Lubricants Company.

Enel starts construction of 300 MW red dirt wind farm in United States

Апреля 19, 2017

The overall investment in the construction of Red Dirt amounts to approximately 420 million US dollars, which is part of the investment outlined in Enel’s current strategic plan, and is financed through the Enel Group’s own resources.

1 2 3
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine