26 Ноября 2024 | вторник | 16:40
|
НовостиAndriy Kobolyev met US Government delegation at NaftogazДекабря 02, 2016The representatives of the US Government confirmed their unchanged interest to continue energy cooperation with Ukraine. At the meeting, the parties discussed further steps for reforming Ukraine’s energy sector and maintaining conditions for secure gas transit to Europe via Ukraine. LUKOIL concludes agreement to sell Grib diamond mineДекабря 02, 2016LUKOIL concluded an agreement to sell its 100% stake in JSC “Arkhangelskgeoldobycha” to “Otkritie Holding” Group for $1.45 bln in cash. The transaction is expected to close in the first quarter of 2017 subject to approval by the relevant government authorities. Contract signed for supply of equipment for Kanev HPPНоября 30, 2016PJSC "Turboatom" and PJSC "Ukrhydroenergo" signed contract UHE/TKNV/C/2-13 "Plant design, Supply and Installation; Rehabilitation of two Blocks (7 hydraulic plants) at Kanev HPP". Global solar PV capacity will approach 295 GW in 2016, led by ChinaНоября 29, 2016The global solar photovoltaic (PV) market is set to increase its installed capacity from around 225 Gigawatts (GW) in 2015 to 294.69 GW in 2016, and will see China remain the world’s largest market for annual solar PV installations, according to research and consulting firm GlobalData. Gazprom Neft achieves net profit growth of 12.7% Y-o-Y for 9M 2016Ноября 25, 2016Net profit reached RUB 147 bln for 9M 2016. Adjusted EBITDA rose 4.1% Y-o-Y to reach RUB 325 bln. Rosneft Brasil Gears Up for the Commencing of Operations in the Solimoes BasinНоября 25, 2016Rosneft Brasil (100% owned Rosneft subsidiary) and Queiroz Galvão Óleo e Gás signed an agreement to charter an onshore drilling rig and associated rig services. Enel invested approximately 287 million US dollars in the construction of the complex n BrazilНоября 24, 2016Enel, through its renewable energy subsidiary Enel Green Power Brasil Participações Ltda. (“EGPB”), inaugurated the Apiacás hydropower complex. The new facility is located in the state of Mato Grosso in Brazil’s Central-West Region, 150 km from Alta Floresta. Global natural gas demand will grow by 50% by 2040 — IEAНоября 23, 2016Global natural gas demand will grow by 50% in the next 25 years, forecasts the International Energy Agency in its latest World Energy Outlook. Annual growth averages for natural gas over this period will be 1.5% which is significantly above expected growth rates for other fossil fuels. An innovative power unit with a turbine unit manufactured by Power Machines is put into commercial operationНоября 22, 2016State-of-the-art Power Unit 4 with the BN-800 fast-neutron reactor has been put into commercial operation as per schedule. Enel starts construction of Peru’s largest solar PV plantНоября 21, 2016Enel, through its Peruvian renewable energy subsidiary Enel Green Power Peru (EGPP), has started the construction of Rubi, which will be the first solar PV plant to be built by the Group in Peru and, once completed, will be the country’s largest PV facility with an installed capacity of 180 MW1. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |