26 Ноября 2024 | вторник | 18:45
Energoterra

Новости

Net income of PJSC Inter RAO for the first 9 months of 2016 was 37.4 billion rubles

Октября 26, 2016

Net income of PJSC Inter RAO for the first 9 months of 2016 was 37.4 billion rubles, compared to 6.8 billion rubles for the same period of 2015. Revenue for the first 9 months of 2016 was 33.1 billion rubles, down 2.5 billion rubles (7.0%) from the first 9 months of 2015.

First Pipe Deliveries Start from the Pipe Mills

Октября 26, 2016

OMK has started its first delivery of high-quality steel pipes for the Nord Stream 2 pipeline from its mill in Vyksa, Russia. The pipes will be transported by rail to the coating plant in Kotka, Finland/

TATNEFT Is amongst the World Leaders in the Creation of the Company’s Shareholders Profitability

Октября 26, 2016

The ranking of the Boston Consulting Group (BCG) defined that TATNEFT joined the top five leaders of creating the shareholders’ profitability in the oil industry.

Wärtsilä secures power supply for remote gold mine in Papua New Guinea

Октября 26, 2016

Wärtsilä has signed a two-year maintenance and advisory agreement with Simberi Gold Company Limited. The agreement covers, in addition to scheduled maintenance, expert advisory services to ensure continuous and sufficient power supply for Simberi's gold mine operations on Simberi Island.

Unipro Publishes the RAS Accounting Statements for 9 Months of 2016

Октября 25, 2016

Unipro PJSC publishes the accounting statements for nine months of 2016, prepared according to the Russian Accounting Standards (RAS).

Sumy NPO signed an agreement on the column equipment supply for Kachanovsky GPP

Октября 24, 2016

PJSC “Sumy Machine Building Science-and-Production Association” signed a contract with a domestic company “Ukrnafta” for the supply of regeneration-evaporation column K-2.

Unipro increased power generation by 3.3% in January–September 2016

Октября 21, 2016

Over the 9 months of 2016, the power plants of Unipro PJSC have generated 39.9 bln kWh, which is 3.3% more compared to the same period of 2015.

Oil Company Yangpur got the right to conduct geological study of subsoil plot of Izvestinsky license area

Октября 19, 2016

Oil company Yangpur got the right to carry out a complete geological study of subsoil plot of Izvestinsky license area to build up the resource base.

Enel will be investing approximately 500 million US dollars in the construction of the new wind farm in Missouri

Октября 18, 2016

Enel S.p.A., through its renewable energy subsidiary Enel Green Power North America, Inc. (EGPNA), has started construction of the Rock Creek wind farm, the first Enel farm to be built in the state of Missouri.

Wärtsilä to supply 28 MW power plant to Brazil

Октября 18, 2016

Wärtsilä signed a contract with Imetame Energia in May 2016 to supply a 28 MW natural gas power plant to UTE Prosperidade I in Brazil. The power plant will be equipped with Wärtsilä 34SG engines operating on the "Gas to Wire"-concept.

1 . . . 118 119 120 121 122 123 124 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine