20 Января 2025 | понедельник | 01:03
|
НовостиThe Ecuadorian project report was presented at BelorusneftЯнваря 29, 2015From field work to digital processing: the results of seismic operations in Ecuador were successfully reported at Belorusneft. The seismic operations were performed on the total area of 167 square kilometers. In 2014 LUKOI has discovered 14 new oil fieldsЯнваря 29, 2015In 2014, as a result of prospecting, 14 fields were discovered, while 38 oil deposits were identified in the exploration areas and producing fields. In 2014, the company obtained 18 new licenses for subsoil use. ROSATOM Spearheads Expertise And Knowledge Transfer Within ASEAN Countries To Develop Nuclear IndustryЯнваря 29, 2015The Russian Corporation ROSATOM demonstrated their support for nuclear development in Malaysia and the rest of the ASEAN countries at the 6th Nuclear Power Asia Conference (NPA) that took place from January 27 to 28 in Kuala Lumpur. The specialists from Temelin NPP made a point on high production culture at the site of JSC MSZЯнваря 28, 2015A working visit of specialists from Temelin NPP has been completed at JSC Mashinostroitelny Zavod, the purpose of the visit was the oversight of the production fabrication for this NPP in accordance with the contract between SC ČEZ Group and JSC TVEL. ROSATOM Advocates Open Channels of Communication to Increase Public Acceptance of Nuclear EnergyЯнваря 28, 2015In conjunction with the 6th Nuclear Power Asia Conference, ROSATOM Corporation organized a pre-conference workshop titled “Improving Public Acceptance: Best Practices”. Gazprom Neft Board of Directors reviews utilisation and more effective usage of associated petroleum gasЯнваря 28, 2015The Gazprom Neft Board of Directors has reviewed its strategy on APG utilisation and effectiveness throughout 2014, as well as plans for 2015–18. Energy supply system is being established at Vostochno-Messoyakhskoye fieldЯнваря 28, 2015The transportation of six 13MW gas-turbine power units to the Vostochno-Messoyakhskoye field, for construction of a gas-turbine thermal power plant (GTPP), has now begun. “Turboatom” finished manufacturing of condenser for Balakovskaya NPPЯнваря 28, 2015At OJSC “Turboatom” was finished manufacture of condenser for Unit No 2 Balakovskaya NPP (Russia). In January 2015 specialists of enterprise manufactured 6 modules of last, the third casing of condenser. Stroytransgaz completed construction of Leningradskaya NPS-2 Gatchinskaya overhead transmission lineЯнваря 28, 2015Stroytransgaz PJSC (STG) completed construction of Leningradskaya NPS-2 Gatchinskaya overhead transmission line for the needs of FGC UES JSC - MES North-West. STG will build power lines to transmit electricity from the Russian-Chinese CHPPЯнваря 28, 2015STG PJSC won the tender and signed a contract for construction of new transmission lines to ensure 450 MW electrical power capacity of new generation in Yaroslavl oblast - Yaroslavl (Huadian-Teninskaya) Combined Cycle Power Plant. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |