23 Января 2025 | четверг | 23:52
|
НовостиTurboatom is renovating the laboratory facilitiesАвгуста 18, 2014OJSC "Turboatom" equips the Central Plant Laboratory with new equipment. In July 2014, the plant laboratory starts installation of motorized pendulum impact machine of Instron company (USA). Operational results of Kuzbasskaya Toplivnaya Company OJSC for the 2 quarter and 6 months 2014Августа 16, 2014Kuzbasskaya Toplivnaya Company OJSC (KTK, MICEX: KBTK), one of the largest producers and exporters of thermal coal in Russia, is pleased to announce operational results for the 2 quarter and 6 months 2014. ROSATOM delegates took part in the Nuclear Energy WeekАвгуста 16, 2014From 11 until 15 of August the Nuclear Energy Week is being held in Rio de Janeiro at the Federal University of the State Rio de Janeiro, Brazil. Autotransformer replacement works commenced at Novosibirskaya HEPPАвгуста 15, 2014At the installation site of Novosibirskaya HEPP, assembly of the new autotransformer T6 got started. Currently, detachable equipment is being installed, and the transformer is being filled with oil. SUEK publishes corporate social responsibility report for 2011-2013Августа 15, 2014Siberian Coal Energy Company has published its new corporate social responsibility report. Trilateral Negotiations Needed To Guarantee European Energy SecurityАвгуста 14, 2014Transfer of the site for gas purchase from the western border of Ukraine to the western border of Russia would ensure stable transit of gas to the European Union and ultimately guarantee energy security. Cheboksarskaya HEPP will transfer all its turbines to the adjustable-vane modeАвгуста 14, 2014Upon reconstruction, a hydroelectric unit No. 6 was commissioned at Cheboksarskaya HEPP. The manufacturer has redesigned the vane adjustment mechanism of the turbine wheel and has reactivated its adjustable-vane operating mode. Ukraine Ensures Reliable Gas Transit to European Consumers Despite Strained Relations with RussiaАвгуста 14, 2014The draft law of Ukraine 'On Sanctions', which was submitted for the consideration of parliament by the Cabinet of Ministers of Ukraine on August 8 does not envision automatic introduction of economic and restrictive measures. Ukrtransgas Completes Project to Allow for Gas Transit from SlovakiaАвгуста 14, 2014Ukrtransgas completed a full range of works to create the technical opportunity to accept natural gas from Slovakia at the Uzhhorod compressor station. The project was conducted by the companу on schedule and at its own expense. The railway track to the Elga deposit is 91% completeАвгуста 14, 2014The Federal Railway Transport Agency granted its permission to run wagons along the non-public railway track leading to the Elga coal deposit, which is still under construction. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |