03 Февраля 2025 | понедельник | 06:48
Energoterra

Новости

"Krasny Kotelshchik" obtained ASME Certificates

Сентября 13, 2013

PJSC “The Taganrog Boiler-Making Works “Krasny Kotelshchik” has obtained the Certificates of the American Society of Mechanical Engineers confirming the conformity to the ASME Code of the manufacture of boilers and pressure vessels.

Power Machines OJSC announces financial results for the first six months of 2013

Сентября 13, 2013

Power Machines OJSC, Russia’s largest manufacturer of power generating equipment, announces financial results for the first six months of 2013, compiled in accordance with International Accounting Standards (IAS).

LUKOIL starts exploration drilling in Sierra Leone

Сентября 13, 2013

Official events attended by Ernest Bai Koroma, President of the Republic of Sierra Leone, Gennady Gatilov, Deputy Minister of Foreign Affairs of Russia, and Andrey Kuzyaev, President of LUKOIL Overseas, have been held today in Sierra Leone on the occasion of the launch of drilling on the SL-5-11 block in the deepwater shelf of the West Africa.

GAZPROM Germania Takes Combined Heat-and-Power Plants Online

Сентября 12, 2013

GAZPROM Germania has entered the decentralized energy supply business. Its two high-efficiency combined heat-and-power plants in Erfurt in the German state of Thuringia were brought online.

Special supplement to Nuclear Engineering International issue dedicated to the Russian AES-2006 project published

Сентября 12, 2013

An international magazine Nuclear Engineering International (NEI) together with Rusatom Overseas (a subsidiary of ROSATOM Corporation) created a special supplement to the NEI magazine, which is devoted to the Russian AES-2006 project with VVER -1200 reactor.

Power Machines OJSC to deliver turbine for shale factory in Estonia

Сентября 12, 2013

Kaluga Turbine Works (KTZ), a part of Power Machines OJSC, has signed a contract to deliver a steam turbine for shale factory in Kohtla Jarve (Estonia).

SUEK concluded a contract with Tikhvinsky Carriage Works (TCW) on delivery of 6000 innovative BARBER S-2-R bogie carriages

Сентября 12, 2013

The carriages have increased load capacity (75 tons) and special tariff. The design of BARBER S-2-R bogie features technologies, which allowed to produce the undercarriage of rail cars with safety, functional reliability and life cycle cost indices having no analogs on the RF and CIS territory.

LUKOIL continues impementation of social project in Basra Province (Republic of Iraq)

Сентября 12, 2013

LUKOIL Mid-East Ltd (operating company of LUKOIL for development of West Qurna-2 field) has completed another social project in Basra Province (Iraq).

“Belorusneft” has voiced its suggestions on implementation of the geological exploration project in Ecuador

Сентября 11, 2013

This was the first time “Belorusneft” hosted Chilean partners from the alliance of companies that signed an agreement in July to conduct joint geological exploration and development in the south-west of Ecuador.

Gazprom is Russia’s most prepared Company capable of independently implementing offshore projects in the Arctic

Сентября 11, 2013

St. Petersburg hosted the opening of the 11th International Conference for Oil and Gas Resources Development in the Russian Arctic and CIS Continental Shelf (RAO/CIS Offshore 2013). A Gazprom delegation is taking part in the event.

1 . . . 473 474 475 476 477 478 479 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine