01 Февраля 2025 | суббота | 18:51
|
НовостиKrasny Kotelshchik has shipped equipment for Tripolskaya TPPАпреля 23, 2013Taganrog Boiler-Making Works Krasny Kotelshchik (the main manufacturing facility of PJSC EMAlliance, which is a part of power-plant engineering concern OJSC Power Machines) has completed manufacturing and shipment of equipment for Tripolskaya TPP. Both forest roads and highways are completed with crushed stone from Eesti Energia’s minesАпреля 23, 2013Last year, Eesti Energia’s mines sold over a million tonnes of mine waste rubble and crushed stone, generated by the mining of oil shale. The material produced in 2012 was partly used, for example, in the construction of the Jõhvi to Kuremäe basic road and state-owned forest roads. Gazprom Neft signed a USD 1 billion loan agreementАпреля 22, 2013Gazprom Neft signed a USD 1 billion term and revolving loan agreement with a group of banks. Funds available under the agreement are provided on an unsecured basis and shall be used for general corporate purposes of the company. Borodino open-pit mine launched improvement of the walking excavatorАпреля 22, 2013This is the first excavator to undergo a complete overhaul of its electrical system this year. Mining machines have been under modernization at the open-pit site since 2007. Over this time electrical systems were completely replaced on eight excavators ЭКГ-8ус, ЭКГ-10 and ЭКГ-12,5. Turboatom manufactured and assembled the first case of condenser of Rostov NPPАпреля 22, 2013In April 2013, in the workshop of machining and welding manufacture OJSC "Turboatom" in the presence of the customer’s representatives took control assembly of the first case of the condenser of the turbine – million of unit No 4 of Rostov NPP, which consists of six modules TMK and Skolkovo Fund Sign Agreement to Establish R&D CentreАпреля 21, 2013TMK, a leading global manufacturer of tubular products for the oil and gas industry, has signed an agreement with the Skolkovo Fund to open its research and development facility in the Skolkovo Innovation Centre. A New Automatic Filling Station Opened in AlmetyevskАпреля 21, 2013Another automatic TATNEFT's filling station has been opened at Mira Street in Almetyevsk (Republic of Tatarstan). Construction of automatic filling stations today is one of the promising areas of the Company's filling stations network development. Turboatom continues to manufacture equipment for the updating of Zuevskaya TPPАпреля 21, 2013In April 2013 the specialists of OJSC "Turboatom" (Ukraine) produced and presented to the customer rotor cage and diaphragm low pressure cylinder for the block No 3 Zuyevskaya TPP worth about 57 million UAH. Equipment is packed and shipped to the plant. Vladivostok-LNG project – a focus of discussions during visit to JapanАпреля 21, 2013Led by Alexey Miller, Chairman of the Gazprom Management Committee, the Company's delegation paid a visit today to Japan prior to the official visit of Shinzo Abe, Japanese Prime Minister to Russia scheduled for late April 2013. Suzunskoye Field Reserves Increase by 15% Following Additional ExplorationАпреля 19, 2013Recoverable reserves of Suzunskoye field increased almost 15% reaching 44.9 mln tonnes of oil. Revaluation was conducted after drilling of an additional well, which gave flow rate of 281 tonnes per day. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |