01 Февраля 2025 | суббота | 10:40
|
НовостиRostov NPP: Rostekhnadzor carries out a planned inspection of the Units under constructionМарта 29, 2013The commission of the Don interregional territorial administration on supervision of nuclear and radiation safety (Rostekhnadzor) began planned inspection of Rosvov NPP units under construction №3 and №4. Mechel Announces Early Redemption of Stock Bonds at Total Sum of 5 Billion RublesМарта 29, 2013On March 27, 2013 Mechel OAO decided on early redemption of its 05 series non-convertible interest-bearing documentary bonds (ID serial numbers 4-05-55005-Е), placed on October 20, 2009, as well as to pay the accumulated coupon interest for the 14 coupon period. Gazprom and Sovcomflot discuss LNG marine shippingМарта 28, 2013The Gazprom headquarters hosted a working meeting between Alexey Miller, Chairman of the Management Committee and Sergey Frank, Director General of Sovcomflot. INTER RAO UES Group starts construction of unit 12 at Verkhnetagilskaya TPPМарта 28, 2013INTER RAO UES Group started the construction of a new 420 MW steam-gas power generation unit at Verkhnetagilskaya TPP. The new power generation unit must be operational by December 2014. Gazprom to strengthen presence in international NGV marketsМарта 28, 2013The Gazprom Board of Directors took notice of the information about the Company's efforts aimed at expanding natural gas use as a motor fuel abroad. The Company’s Management Committee was tasked to continue strengthening Gazprom positions in international NGV markets. Gazprom Neft updates motor oils business development strategy 2025Марта 27, 2013Gazpromneft Lubricants, the Gazprom Neft subsidiary that specializes in the production and sale of motor oils, lubricants, and technical fluids, has updated its long-term development strategy by defining targets to be reached before 2025. Gas supply payment regulation in need for improvementМарта 27, 2013The Gazprom Management Committee took notice of the information on developing the Russian gas market and enhancing the payment discipline. Power Machines manufacture a turbogenerator for Ekibastuzskaya TPP-1 in KazakhstanМарта 27, 2013Power Machines OJSC has manufactured and successfully tested a 550 MW hydrogen-to-water cooled turbogenerator for the second power unit of Ekibastuzskaya TPP-1 (Republic of Kazakhstan). Gazprom boosting efficiency of associated petroleum gas utilizationМарта 27, 2013The Gazprom Management Committee took into consideration the information relevant to boosting the efficiency of associated petroleum gas (APG) utilization in Russia. Turboatom completes work on manufacturing equipment to Tripolskaya TPPМарта 27, 2013OJSC "Turboatom" units manufactured turbine control system to upgrade the unit No 2 Tripolskaya TPP (Ukraine). Equipment transferred to the assembly and testing shop, where it will be collected and tested in the presence of the customer. |
Контакты Адрес: 115114 Россия, 620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3 Тел. / факс (343) 345-09-72 г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51 E-mail: info@energyland.info |
О проекте | Powered by <Unknown> engine |