31 Января 2025 | пятница | 20:51
Energoterra

Новости

Bashneft opens a new oil field in western Bashkortostan

Января 28, 2013

Bashneft opened a new oil deposit located in Khasanovskoye license area which was named after Vladimir Afanasyev, former chief geologist of Bashneft.

TNK-BP to Invest $60 Million in Construction of Hydrocarbons Sulfur Removal Facility at RORC

Января 27, 2013

TNK-BP reports that it will invest over $60 mln in the construction of a hydrocarbons sulfur removal facility at CJSC Ryazan Oil Refinery Company (RORC, part of the TNK-BP Group). The facility is planned to be commissioned in 2015.

Gazprom places higher demands on pipes for South Stream and Power of Siberia

Января 26, 2013

The Gazprom headquarters hosted a regular meeting of Alexey Miller, Chairman of the Company's Management Committee and heads of Russian pipe manufacturing companies.

Mechel Reports Resumption of Mining at Mechel Bluestone Mining Facilities

Января 24, 2013

Mechel OAO (NYSE: MTL), one of the leading Russian mining and metals companies, reports the resumption of work at several of Mechel Bluestone's (West Virginia, USA) mining facilities. Mechel Bluestone is part of the Group’s mining division.

TATNEFT Has Increased Collection and Processing of Petroleum Gas

Января 24, 2013

"Tatneftegazpererabotka" Administration (UTNGP) of the JSC TATNEFT collected 843.5 million m3 of associated petroleum gas for the year 2012, which was 53.1 million cubic meters more than in 2011.

In 2012 Ignalina NPP Reduced Its Expenditure for Energy Resources

Января 24, 2013

In 2012 State Enterprise Ignalina Nuclear Power Plant (INPP) saved 12 million litas due to the fact that it used less energy resources than it was scheduled.

Cost optimization in Gazprom core operations to result in some RUB 50 billion savings in 2013

Января 24, 2013

The Gazprom Management Committee Chairman Alexey Miller approved the Company's Comprehensive Cost Optimization Plan for 2013.

Gazprom Export has applied to Vienna Commercial Court for cancellation of the arbitration decision with RWE Transgas

Января 23, 2013

Gazprom Export appealed to the Vienna Commercial Court on 8th January 2013 against the arbitration decision made on October 4th 2012 concerning the dispute with RWE Transgas.

Igor Sechin Reports to Vladimir Putin on Rosneft Performance in 2012

Января 23, 2013

Rosneft CEO Igor Sechin reported today to the President of the Russian Federation Vladimir Putin on Rosneft performance in 2012.

Gazprom Neft acquires bitumen production facility in Kazakhstan

Января 22, 2013

Gazprom Neft has acquired Bitumen Plant LLP, a new bitumen production facility with an annual capacity of 280,000 tonnes, located near Shymkent, in Southern Kazakhstan.

1 . . . 530 531 532 533 534 535 536 . . . 917
Контакты
Адрес: 115114 Россия,
620137 г. Екатеринбург, ул. Студенческая, д. 1 корп. 3
Тел. / факс  (343) 345-09-72
г. Москва, 1-й Дербеневский переулок, д. 5 тел. (495) 287-98-51
E-mail: info@energyland.info
О проекте Powered by <Unknown> engine